Fota Wildlife Park Foaty Foaty Island
Planning application 04/6658
DecisionConditional grant
Decided06 December 2004
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Fota Wildlife Park Foaty Foaty Island?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 23/5847Permission for the erection of a new steel-framed building to house a group of Siamang Gibbon. This new building will replace the small existing timber Siamang Gibbon building which is to be demolished. The development includes the construction of a new pedestrian pathway to the new building, the installation of a foul sewage holding tank and all associated site development works. A Natura Impact Statement (NIS) will be submitted with the application. / 0.1 km away / 06 February 2024Granted
- 03/4049Construction of single storey animal shed / 0.1 km away / 07 October 2003Granted
- 18/6097The development will include extending the existing Wildlife Park to include the development of approx 10.5 Ha of additional lands for which permission for development was previously granted under S/03/2273. The development works will include the construction of 17 no. buildings which includes 13 buildings for animal housing, an educational/viewing building, an entrance ticket building with small souvenir shop, a restaurant with public toilets, and an animal dung storage building. It also includes the extension of an existing pond, the construction of two new ponds and a connecting canal to a wetland that will provide a natural vegetative filtration system using halotolerant plant species. It includes the completion and extension of existing internal roadways, construction of pathways including a raised walkway, modification and addition to existing landscaping, preservation works to disused lime kiln, underground services, re-configuration of roadway markings and signage at main entrance from the public road, and construction of flood prevention measures to the existing wildlife park lands and to the additional lands by the construction of an earth berm, repairing sea wall and reconstructing sluice system. Extension of Duration of Permission granted under Planning ref 13/5641, an EIS was submitted with the application. / 0.2 km away / 01 October 2018Granted
- 13/5641The development will include extending the existing Wildlife Park to include the development of approx 10.5 Ha of additional lands for which permission for development was previously granted under S/03/2273. The development works will include the construction of 17 no. buildings which includes 13 buildings for animal housing, an educational/viewing building, an entrance ticket building with small souvenir shop, a restaurant with public toilets, and an animal dung storage building. It also includes the extension of an existing pond, the construction of two new ponds and a connecting canal to a wetland that will provide a natural vegetative filtration system using halotolerant plant species. It includes the completion and extension of existing internal roadways, construction of pathways including a raised walkway, modification and addition to existing landscaping, preservation works to disused lime kiln, underground services, re-configuration of roadway markings and signage at main entrance from the public road, and construction of flood prevention measures to the existing wildlife park lands and to the additional lands by the construction of an earth berm, repairing sea wall and reconstructing sluice system. / 0.2 km away / 15 October 2013Granted
- 17/7088Construct a bird-viewing shelter together with associated access pathway and site development works, and also for permission to construct a boardwalk through wetlands. / 0.2 km away / 14 May 2018Granted
- 17/7084Demolish an existing monkey house and to construct a replacement monkey house together with all associated site development works / 0.2 km away / 14 May 2018Granted
- 18/7367Erection of single storey Madagascan Wildlife interpretative building, 2 No buildings to house Madagascan Lemur, together with all associated site development works. / 0.2 km away / 20 February 2019Granted
- 03/2273Extension to wildlife park to include fencing, entrance building, stables, hardstand, paddock,pathways,internal roadway,pond & anc. site works / 0.2 km away / 07 July 2003Granted