Demesne Newmarket
Planning application 04/723
DecisionConditional grant
Decided05 April 2004
Application typeOUTLINE PERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Demesne Newmarket?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 03/2055Construction of entrance to dwellinghouse / 0.1 km away / 25 June 2003Granted
- 05/9592Alterations and change of use from furnishing workshop to montessori school including child day care services and additional entrance / 0.1 km away / 23 February 2006Granted
- 05/7442Dwellinghouse / 0.2 km away / 21 March 2006Granted
- 16/4895Upgrade to the existing waste water treatment plant (WWTP) with proposed plant including balance tank, anoxic, anaerobic and aeration tanks, proposed clarifier tank, Dissolved Air Flotation (DAF) plant, underground effluent pumping station, culverts, control room, filters and concrete plinths. The proposed development will include the demolition of the existing 11 meter bio-tower at the Newmarket Co-Operative Creameries Ltd facility in Newmarket town, Co Cork, within the townlands of Garrannawarrig Upper, Park, Garrannawarrig Lower and Liscongill. Installation of an underground pumped pipeline to convey treated water from the facility to a discharge point on the River Dalua, 4 kilometers to the south east of the facility, utilizing the R576 road corridor, including all necessary pipeline connection, drainage and vent infrastructures. Intensification of use of the existing facility through an increase in the duration of the weekly and annual milk processing period at the Newmarket Creamery resulting in an increase in milk processing up to a maximum of 80 million gallons per annum. These changes will be subject to an amendment by EPA, of the existing site Industrial Emissions Directive Licence. An Environmental Impact Statement and Natura Impact Statement accompany this planning application. The proposed development includes work to Allen’s Bridge, a recorded monument under the National Monuments Act and is located within the zone of potential for the historic town of Newmarket which has a Recorded Monument designation. / 0.2 km away / 06 February 2017Granted
- 06/8347Domestic garage / 0.2 km away / 17 August 2006Granted
- 13/5448Construction of a single storey extension to north western side of existing dwelling / 0.3 km away / 17 September 2013Granted
- 07/9523Extension to dwellinghouse / 0.3 km away / 27 August 2007Granted
- 24/4031Permission for retention of dwelling including conservatory, front porch and attached garage and amended site boundaries as existing. Permission for decommissioning and removal of septic tank and installation of waste water treatment unit to dwelling and associated works / 0.3 km away / 05 March 2024Granted