Site No. 4 Wallingstown Little Island
Planning application 04/9712
DecisionConditional grant
Decided09 May 2005
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Site No. 4 Wallingstown Little Island?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 06/13060Change of use of 3 no. units from light industrial use to wholesale warehouse use for storage and distribution with ancillary trade counter and ancillary offices and internal and external alterations to same to include amalgamation of 3 no. units / 0.0 km away / 05 February 2007Granted
- 13/4009Carry out internal alterations to existing industrial/commercial building, which includes part removal of the existing party wall dividing both units 4 & 5 to form one unit, alterations to the existing ground floor layout of offices, reception and sanitary facilities within unit no. 4, extend the existing first floor within unit no. 4 to accommodate office space, and carry out external alterations which include the installation of windows to existing wall facade of unit no. 4 / 0.0 km away / 28 February 2013Granted
- 04/3501Construction of industrial/commercial building comprising of 4 no. units and associated site works / 0.0 km away / 13 July 2004Granted
- 23/5637Permission for retention of the installation of two liquid oxygen storage tanks 15.81m in height and associated site works within the T82 & S2 bund at BOC Gases Ireland Ltd. The application relates to an establishment to which the Major Accident Regulations apply / 0.1 km away / 30 November 2023Granted
- 25/4926Permission for the development consisting the removal of an existing argon tank and replacement with a new argon tank and plinth. The application relates to an establishment to which the major accidents regulations applies. The application relates to an establishment to which an intergrated pollution control licence is relevant / 0.1 km away / 09 July 2025Granted
- 12/4176Retention of disused fenced compound and permission for alterations and change of use of the compound to open bus storage and a bus washing facility. Development will consist of construction of a boundary fence and 2 no. access gates consisting of construction of an enclosing wall of 1 metre with a fence of 2.5 metres placed on the wall, to give a total height of the boundary of 3.5 metres. Construction of tarmac surface, the installation of a mechanical bus wash, installation of surface water and bus wash water interceptor and waste treatment unit, below ground storm water attenuation tank and a bunded fuel store. Installation of a new roller door at units 3 & 4, Block B, to match existing doors to a height of 4.49 meters and width of 3.63 metres and modification of front elevation. All site works and ancillary development / 0.2 km away / 23 March 2012Granted
- 15/4518Permission for the erection of an advertisement sign and associated works / 0.2 km away / 01 May 2015Granted
- 21/5030Works to front/side of existing office building including the construction of a new vehicular access, car parking area and pedestrian ramps, alterations to existing parking and footpaths and all associated works. / 0.2 km away / 20 October 2021Granted