Kilnagleary Carrigaline
Planning application 05/1768
DecisionConditional grant
Decided20 June 2006
Application typeOUTLINE PERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Kilnagleary Carrigaline?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 22/6451The construction of 51 no. units and all ancillary site development works. The proposed developments will consist of: 43 no. houses comprised of 12 no. 2-bed and 12 no. 3-bed townhouses, 6 no. 3-bed and 12 no. 4-bed semi-detached houses and 1 no. 4-bed detached house all with private amenity space in the form of rear gardens and 8 no. apartments arranged in 2 no. 2.5-3 storey blocks comprised of 4 no. 1-bed apartments and 4 no. 2-bed duplex apartments, all with private amenity space in the form of balconies and/or ground floor rear gardens and served by a bin store (16.55sqm). Vehicular and pedestrian access will be provided via the existing access located off the Eastern Relief Road, Carrigaline. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. / 0.1 km away / 22 June 2023Granted
- 11/5512Completion of mixed residential and commercial development consisting of nine number blocks comprising (1)Block A, a three and four-storey retail, salon and office building (2)Block B, a two-storey crèche, pharmacy and office building (3) Block C a medical centre with four number apartments overhead, (4)Block D, 12 number apartments in three storeys, (5) Blocks E, G and I, nine number apartments in three number three-storeys blocks, (6) Blocks F and H, two terraces of eight and six three-storey townhouses respectively, and (7) all associated car parking and site development works, as permitted by An Bord Pleanala PL 04.219550(Pl.ref.no. 05/8498) / 0.1 km away / 23 August 2011Granted
- 05/8498Mixed residential/commercial developments consisting of 9 no. blocks comprising of 1) Block A, retail, salon and office building 2) Block B, two storey creche, pharmacy and office building 3) Block C, medical centre with 4 no. apartments overhead 4) Block D, 12 no. apartments, 5)Block E,G & I, 9 no. apartments in three storey blocks 6) blocks F & H, 2 no. terraces of 8 and 6 three storey townhouses respectively, associated car parking and site development works / 0.1 km away / 14 August 2006Granted
- 05/5147Demolition of manufacturing and office building and construction of retail tradewarehouse, distribution and service centre for building and construction materials, furnishings with associated facilities, signage, carpark and associated works / 0.1 km away / 13 February 2006Granted
- 22/4958Change of use of the existing 450 sqm gym facility, to builders providers use with associated storage yard. The development will include a 991 sqm extension to the existing building to the southern elevation of the existing building and a new 7.5 sqm entrance porch extension to the northern elevation. Revised vehicular, delivery, cycle and pedestrian access to the site is proposed to the south west of the development, via Kilnaglery business park. The development will also include the provision of additional parking facilities including bicycle parking; delivery vehicle drop-off/ set down areas; boundary treatments; piped infrastructure and ducting; plan, external racking; revision to the existing carpark layout; external lighting; 2 no. branded signs on the north and west elevations; 1 no. attenuation tank; EV charging facilities; SUDs; changes in level and all associated site development and excavation works above and below ground. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application. / 0.1 km away / 09 February 2023Granted
- 17/6619Develop an un-manned petrol and diesel station facility, to include a 2 x 4 hose dispensing pumps on 2 separate pump islands with a canopy above, 2 x 40,000 litre underground fuel storage tanks and associated pipework, new vehicle wash slab and drainage, new 50.40sq.m storage shed, new 10,000 litre petroleum/oil interceptor, new concrete and asphalt ground surfaces and associated drainage works, new concrete post and rail boundary fence and planting, new 6.00m high illuminated price/id sign and a new entrance/exit point. / 0.1 km away / 28 May 2018Granted
- 22/6453The proposed development will consist of: (i) Installation of a jet car wash unit and associated car wash screens, (ii) Installation of 2no. electric vehicle charging units with 4no. associated electric vehicle charging bays, (iii) Installation of solar photovoltaic panels and associated fixtures and fittings on the existing forecourt canopy roof, (iv) Change of use from a storage shed to a retail sales unit of solid fuels, (v) 2no. new car parking spaces, and (vi) all associated underground and overground infrastructure, drainage, lighting and site development works. The development to be retained consists of: (i) Vehicle wash slab and associated drainage system, (ii) Extension constructed to the side of approved building, (iii) Associated façade signage, (iv) relocation of approved illuminated 6m high main ID sign, (v) Constructed equipment storage room, (vi) Constructed service island with air, water and vacuum unit, and (vii) all associated underground and overground infrastructure, drainage, lighting and site development works. / 0.1 km away / 20 December 2022Granted
- 13/5810Change of use from commercial/retail unit to a training centre and headquarters / 0.1 km away / 24 October 2013Granted