22 The Orchard Mallow Co. Cork.
Planning application 05/55055
DecisionConditional grant
Decided24 October 2005
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 22 The Orchard Mallow Co. Cork.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 15/5395Construction of a 2 storey extension to the side of existing dwelling / 0.0 km away / 15 September 2015Granted
- 09/55010Permission for the construction of an extension to the side of existing dwelling in accordance with plans and documents submitted / 0.1 km away / 22 May 2009Granted
- 20/4417The development of the Greenfield site consists of (a) construction of a 98m x 63m grass pitch, (b) provision of a 400m eight lane running track, (c) construction of a building to provide changing facilities, (d) provision of 40 car and 2 bus parking spaces, (e) widening of Sexton’s Boreen, (f) importation of clean, natural soil to grade the field, (g) installation of floodlights, and (h) diversion of water main and associated site works. The Environmental Impact Assessment Report / Natura Impact Statement will be submitted to the Planning Authority with the application. / 0.1 km away / 18 February 2021Granted
- 20/4379Retention of existing extension and permission for construction of extensions to existing dwellinghouse. Extension of Duration to Permission granted under Planning Ref. No 15/4900 / 0.1 km away / 03 June 2020Granted
- 15/4900Retention of existing extension and permission for construction of extensions to existing dwellinghouse / 0.1 km away / 24 June 2015Granted
- 16/5046Construction of an extension onto the side of an existing domestic shed for (domestic purpose) to the rear of dwellinghouse and the construction of timber fence against existing southern property boundary / 0.1 km away / 24 June 2016Granted
- 05/55066Construction of a two storey extension to existing dwelling comprising of a self contained apartment / 0.1 km away / 13 June 2006Granted
- 14/55008Permission for constrction of two single storey stand alone temporary prefabricated general classroom buildings and one single storey standalone temporary prefabricated toilet building to the west of Davis College Post Primary School and construction of four single storey stand alone temporary prefabricated general classroom buildings and one single storey standalone temporary prefabricated toilet building to the north east of Davis College Post-Primary School (total area 312m sq.) including connection to public services and all associated site works and landscaping / 0.2 km away / 29 May 2014Granted