Knockraha East Knockraha
Planning application 05/8901
DecisionRefused
Decided03 February 2006
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Knockraha East Knockraha?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 06/10018Two storey dwellinghouse and garage / 0.6 km away / 18 October 2006Refused
- 07/5268Dwelling / 1.3 km away / 12 April 2007Refused
- 18/6978Construct a single storey dwellinghouse, install an on-site waste water treatment system, provide new site entrance along with carrying out associated site works / 1.3 km away / 11 January 2019Refused
- 05/9354Dwellinghouse / 1.6 km away / 17 February 2006Refused
- 23/4234Permission is sought for Island Stability Services Limited are applying for a 10 year planning permission to develop a low carbon inertia services (LCIA) grid support facility, which will connect to the adjoining ESB Knockraha 220kV Electricity Substation. The proposed development will have a projected life span of 50 years. The development is to be located within a site compound c. 2.2 ha and will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (c.512m2 c.12m high); Customer substation (c.250m2 c.7m high) and TSO substation (c.375m2 c.9m high), Cooling equipment, 6 No. modular containers to house electrical and control equipment, generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker; 1 no. firefighting water tank and pump, boundary fencing (c.3m high) and CCTV, connection to the neighbouring ESB Substation and all other ancillary site works including access roads. / 1.6 km away / 25 January 2024Refused
- 04/3514Dwellinghouse / 1.6 km away / 14 July 2004Refused
- 04/737Dormer dwelling, garage and proprietary treatment unit / 1.6 km away / 05 April 2004Refused
- 05/1145Dwellinghouse and garage / 1.7 km away / 22 April 2005Refused