Ardnageehy Charleville
Planning application 07/10536
DecisionConditional grant
Decided21 April 2008
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ardnageehy Charleville?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 07/8429Alterations and extension to existing lairage incorporating lairage office and isolation pen, relocation of lorry wash, relocation of entrance and construction of buyers office / 0.0 km away / 12 September 2007Granted
- 13/4352Retention of a lean-to structure off an existing building with open front and sides / 0.1 km away / 16 April 2013Granted
- 08/7606Extension to existing maturation chill together with a tray wash facility,tray store & intake bay, link corridor from existing boning hall to the proposed maturation chill and a dry store, site road re-alignment & drainage works. Extension to existing lairage, regrading of the existing stockyard, construction of lairage office building, closure of the existing stock yard entrance, and construction of a new entrance together with associated drainage works. Demolition of existing facilities building, construction of new offal processing unit with staff facilities at first floor level together with associated drainage works. ESB MV substation and customer switch room and associated site works and services / 0.1 km away / 14 January 2009Granted
- 22/5792(a) single storey tray store and fresh product dispatch building (b) two storey packaging room and packaging store (c) to demolish and relocate the existing single storey pallet store (d) to relocate the truck washing and sanitary pre-treatment systems (e) to modify the internal road layout. The existing development relates to an activity which requires an Integrated Pollution Control Licence. / 0.1 km away / 22 September 2022Granted
- 05/1002Dwellinghouse / 0.2 km away / 19 April 2005Granted
- 05/7285Retention of conservatory, bay window, patio door, 3 no. dormer windows and 3 no. velux rooflights to dwelling / 0.2 km away / 30 November 2005Granted
- 07/6890Retention of domestic garage / 0.2 km away / 30 July 2007Granted