Finisk Killeagh
Planning application 07/11938
DecisionConditional grant
Decided18 December 2007
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Finisk Killeagh?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 11/6392Construction of two storey dwelling, entrance, domestic garage, treatment unit and associated site works / 0.1 km away / 07 March 2012Granted
- 03/3294Dwellinghouse and waste water treatment system / 0.4 km away / 27 August 2003Granted
- 03/3029Dwelling and garage / 0.4 km away / 09 May 2005Granted
- 20/4837To erect a single storey dwelling house with the roof designed to accommodate a future conversion of the attic to habitable space, a domestic garage, an on-site sewage treatment system, and all associated site development works. / 0.4 km away / 20 July 2020Granted
- 06/5824Attic conversion and installation of rooflights to dwelling / 0.5 km away / 18 May 2006Granted
- 20/5815To demolish the existing pig buildings and to construct a new pig finishing building, two no. feed silo buildings, control room, office, toilet and welfare facilities and a septic tank and raised filter bed percolation area. It also includes for a housed new bored well, water storage tank, a part underground covered slurry storage concrete tank with adjoining loading ramp and earthen bund, new internal roads and service yard, a modified existing site entrance, and landscaping, together with all necessary utilities and site works. A Natura Impact Statement and an Environmental Impact Assessment Report will be submitted to the planning authority with this application. The development comprises of an activity in relation to which an Integrated Pollution Prevention and Control Licence is required. / 0.5 km away / 06 April 2021Granted
- 06/5529Dwellinghouse and garage / 0.6 km away / 08 May 2006Granted
- 05/6051Dwelling / 0.6 km away / 17 October 2005Granted