Cloghanughera Charleville
Planning application 07/4006
DecisionConditional grant
Decided26 February 2007
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cloghanughera Charleville?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 07/13160Dwellinghouse and installation of septic tank / 0.2 km away / 15 February 2008Granted
- 10/5256Extension to side of dwellinghouse / 0.4 km away / 15 July 2010Granted
- 03/3677Dwellinghouse and treatment plant / 0.4 km away / 27 November 2003Granted
- 08/8310Dwelling, garage, septic tank & associated site works / 0.4 km away / 03 November 2008Granted
- 08/6452Construction of sunroom extension to dwelling / 0.4 km away / 23 June 2008Granted
- 17/5292Works to connect the permitted Boolard Wind Farm (Reg. Refs. 12/5997 and 15/5521/PL.04.245560) to the existing Charleville 110kv ESBN substation comprising as follows: installation of approximately 5.694 km of 20kv underground electricity cable and fibre communications cable in ducting; 12 no. joint bays, 12 no. communications chambers and 2 no. earth link boxes (all underground); access covers to chambers and boxes at finished surface level; ancillary marker posts and marker plates as necessary; the replacement of an existing concrete pipe with a box culvert under an existing agricultural track and the construction of new parapet walls above the track; and all associated site development and reinstatement works. The development will consist of alterations to permitted wind farm site layout (as per Reg. Ref. 12/5997 and 15/5521 / PL.04.245560) as follows i) widening of permitted vehicular site entrance, ii) provision of 2 no. turning areas/overrun areas for turbine delivery/construction vehicles off the permitted wind farm site road iii) localized realignment and refinement of internal wind farm site road network, iv) increased crane pad size at both permitted turbine locations, and v) also, construction of control building (minor change of location from Reg. Ref. 15/5521/PL.04.245560). / 0.5 km away / 26 January 2018Granted
- 06/12275Two storey dwellinghouse / 0.6 km away / 23 May 2007Granted
- 12/6548Construction of a two-storey dwellinghouse, domestic garage, septic tank, percolation area, and all associated site works / 0.7 km away / 09 July 2013Granted