Farrangalway Kinsale
Planning application 08/5588
DecisionConditional grant
Decided23 July 2008
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Farrangalway Kinsale?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 09/7409Construction of single storey building housing 6 no. golf practice bays (daylight only) and a ball wash and dispensing area / 0.1 km away / 07 December 2009Granted
- 11/4429Installation of flood lighting to existing practice grounds / 0.1 km away / 28 April 2011Granted
- 19/4293Retention of two timber domestic storage sheds, well and associated site works and services. / 0.3 km away / 13 May 2019Granted
- 25/416710 Year Planning permission for a solar farm with a total area of circa 9 hectares. The solar farm will consist of solar panels on ground mounted frames, 2 no. single storey electrical inverter/transformer stations, 2 no. containerised energy storage modules, 1 no. single storey spare parts container, 1 no. medium voltage control/switching substation (comprising either single-storey building or 2 no. modular units), 1 no. weather station, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 1 no. existing entrance from the L7247. The operational lifespan of the solar farm will be 40 years and planning permission is requested for the duration. / 0.3 km away / 15 September 2025Granted
- 17/73011. Demolish existing timber Extension to the rear (north) of the existing cottage, 2. Restore existing old cottage – repair roof, add two roof lights to the northern roof, replace windows with new, build new porch (replacing old) to the south of the cottage. 3. To the north of the existing cottage, construct a new one-and-a-half storey dwelling extension, with single storey ‘link’ to the cottage, 4. Decommissioning existing well, drill and install a new well within the site, 5. Decommissioning existing septic tank and install a new septic tank and percolation area within the site, 6. Carry out all associated site works. / 0.4 km away / 24 March 2018Granted
- 04/5362Domestic garage / 0.4 km away / 03 September 2004Granted
- 03/4385Dwelling (change of plan) / 0.4 km away / 28 October 2003Granted
- 03/1305Dwellinghouse / 0.4 km away / 22 May 2003Granted