Curraghbinny Carrigaline
Planning application 09/5007
DecisionConditional grant
Decided25 May 2009
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Curraghbinny Carrigaline?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 12/5269Construction of a single storey workshop building with mezzanine floor and all associated site works / 0.2 km away / 26 July 2012Granted
- 06/4562Construction of 2 no. utilities buildings, alterations to elevations of existing maintenance building 105 and alterations and extensions to existing Production building 101 and associated site works / 0.2 km away / 30 March 2006Granted
- 12/6195Amend existing practices to import high calorific value fuel and solvent waste generated off-site in Ireland for use in thermal recovery processes. This proposal does not involve any fundamental change from present site activities and there will be no intensification of past use. There is no construction work associated with the proposal. / 0.2 km away / 23 January 2013Granted
- 20/4292The works will include the following (1) installation of a 7.8 tonne/hr natural gas fired steam generator within the existing boiler house and associated pump skids, pipework, electrics and control system, (2) installation of a 18.6m high, 1,050mm diameter flue gas stack on the steam generator including support steel and access platforms, (3) installation of a 810mm diameter interconnecting flue gas duct, (4) installation of a 4,000 litre stainless steel water storage feed tank (trap separator) and booster pumps within the existing boiler house, (5) excavation works and reinforced concrete foundation for the flue gas stack and (6) provision of new trimmer steel to existing boiler house roof to facilitate installation of the new flue gas stack. The proposed development is covered by an existing Industrial Emissions License No. P0004-05. The proposed development relates to modifications to an establishment within the meaning of Part 11 (Major Accidents Directive) of the Planning and Development Regulations, 2001 as amended. / 0.2 km away / 07 April 2020Granted
- 11/4969Erection of 1 no. wind turbine with hub height of up to 100m, blade radius of up to 50.5m and overall height from ground to tip of blade of up to 150.5m, upgrade of existing site roads, construction of internal site tracks and all other associated works / 0.2 km away / 22 February 2012Granted
- 06/7642Construction of 99m rock revetment coast protection to north of existing works and construction of 150m of rock revetment coast protection to south of existing protection works / 0.2 km away / 23 October 2006Granted
- 15/4741(a) Partial demolition of a single storey rear façade of the existing Production Building 8, (b) construction of 3 no. internal floors within the existing Production Building 8 and, (c) construction of 2 no. extensions to the existing Production Building 8 comprising of a small scale, single storey production facility to the rear (south) and an entrance lobby to the front (north) together with all associated site works / 0.2 km away / 02 June 2015Granted
- 11/4024Demolition of an existing single storey lobby and construction, in its place of a single storey part lobby part new laboratory extension to northern elevation of existing Production Building 8/9 and associated internal alterations and external works at their site at Currabinny, Carrigaline. / 0.2 km away / 22 February 2011Granted