Ballytrasna Little Island
Planning application 09/5791
DecisionConditional grant
Decided27 July 2009
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballytrasna Little Island?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 13/5922Construction of a single storey extension to the administration block along the north elevation to accommodate additional canteen and locker space, including a glazed walkway, internal alterations, alterations to the ground and first floor façade on the western and northern elevations and construction of a single storey reception/security building along with all associated site works / 0.0 km away / 18 November 2013Granted
- 12/6116Extension to administration block at north-east end of site to accommodate new laboratories at ground floor and associated offices at first floor along with associated works, along with retention of emergency stairway to south elevation of main warehouse and retention of annex building and foam house buildings to the west elevation of main warehouse / 0.0 km away / 30 November 2012Granted
- 17/6852The erection and installation of solar photovoltaic panels on to the roof of the main PepsiCo building and all associated site works / 0.0 km away / 26 March 2018Granted
- 17/4018(a) The construction of 3348m2 two storey warehouse including yard canopy and covered ramp, (b) the construction of a 186m2 single storey building for the recycling of packaging materials and (c) all associated drainage and site works. / 0.0 km away / 28 February 2017Granted
- 16/4283The construction of a new tank washing building. / 0.0 km away / 05 April 2016Granted
- 17/6553Relocation of existing equipment and the construction of a new 50sq.m annex building to the west side of the existing Process Room and all associated site works. / 0.0 km away / 22 November 2017Granted
- 16/4513Construction of a new plant room adjacent to the existing production building, comprising of a two storey steel frame with the steel cladding on the upper section. New floor area to be 143sq.m with an overall height not exceeding 10.513m / 0.0 km away / 27 April 2016Granted
- 20/5627An extension to the existing production building, expansion of the site utility services, and provision of a new waste water treatment plant at this site. The proposed development will comprise of: (i) a three storey 1,723 sqm extension to a maximum height of 21.145m, including roof mounted equipment, to the north-west side of the existing single storey production building (maximum height of 9.35m), (ii) expansion of the utility yard to the west and north of the extension which will include; a chilled water system and buffer tanks, a clean-in-place system, a bunded diesel storage tank, a diesel generator and associated flue, a new boiler flue, a juice unloading bund, a 24 sqm single storey extension to the sprinkler pump house, and associated equipment access platforms and pipe racks (iii) a 118 sqm single storey chemical drum store lean-to enclosure (iv) a new waste water treatment plant, which will include c.1,856 sqm area of bunded tanks, a 165sqm single storey control building, a 64 sqm single storey electrical substation building, and a reconfigured access from the public road (v) the decommissioning and relocation of 40 No. existing car parking spaces from the existing R&D facility to a proposed extension to the car park (under construction) permitted under planning application reference 19/06776, and the addition of 13 No. new parking spaces (vi) temporary contractor’s compound, and (vii) all associated underground services, site development works and landscaping. The proposed development will also include the demolition and removal of redundant structures and equipment and the decommissioning of the existing waste water treatment plant. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application. / 0.1 km away / 20 November 2020Granted