Slievemore Sherkin Island Baltimore Co. Cork
Planning application 10/851
DecisionConditional grant
Decided31 January 2011
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Slievemore Sherkin Island Baltimore Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 02/4376Dwelling / 0.1 km away / 23 December 2002Granted
- 02/1306Dwelling / 0.1 km away / 24 May 2002Granted
- 11/446Extension to a cottage, with a new two storey volume to the east linked to the building and the replacement of a single storey service volume, to the rear of the building / 0.1 km away / 06 September 2011Granted
- 09/552Construct single storey extension containing 1no. ensuite bedroom and study; Reroof existing outbuilding, raising ridge level by 1.03m, to be used for storage purposes only / 0.1 km away / 02 July 2009Granted
- 02/2753Dwellinghouse and garage / 0.2 km away / 20 December 2002Granted
- 26/0224The Proposed Development will consist of the installation of 1 no. 12m monopole telecommunications structure carrying 2 no. radio-link dishes, ground-based single bay-cabinet, fibre chamber, temporary access track, 1.2m wooden post and rail fencing with 1m access gate, ancillary equipment and all associated site development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed. / 0.4 km away / 31 March 2026Granted
- 23/737Erection of slatted house and associated site development works / 0.5 km away / 19 February 2024Granted
- 03/2607Retention and completion of garage/workshop / 0.5 km away / 24 July 2003Granted