Loughbeg Ringaskiddy.
Planning application 11/6484
DecisionConditional grant
Decided25 April 2012
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Loughbeg Ringaskiddy.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 17/7092Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas / 0.0 km away / 23 January 2018Granted
- 17/7091Retention of a 124 square meter single storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas. / 0.0 km away / 23 January 2018Granted
- 11/6525Retention of a section of existing inner service link road to the east of existing manufacturing facility / 0.0 km away / 25 April 2012Granted
- 18/7056Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW. / 0.1 km away / 16 January 2019Granted
- 17/7090Retention of a 107 square meter single storey timber framed structure for office use within the loading bay area to the north of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas. / 0.1 km away / 23 January 2018Granted
- 11/6617Retention of 107sq.m single storey timber framed strucure for office use within the loading bay area to the north of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas. / 0.1 km away / 09 February 2012Granted
- 11/6485Retention of 70 car spaces to the south of the existing manufacturing facility / 0.1 km away / 25 April 2012Granted
- 09/7065Construction of new biomass boiler house incorporating a storage bunker / 0.1 km away / 09 November 2009Granted