Ards Beg Mealagh Valley Bantry Co. Cork
Planning application 11/758
DecisionConditional grant
Decided01 February 2012
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ards Beg Mealagh Valley Bantry Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 21/152Permission sought for retention of 2 no. detached storge containers ancillary to existing community centre and for permission sought for an additional use of the existing community centre to include use as a preschool with after school services / 0.0 km away / 19 April 2021Granted
- 21/737Development will consist of; The application will seek permission to remove the existing grid connection works and for the development of the full length of a new grid connection over a distance of approximately 14.8km, between the existing Ballylicky ESB substation and the permitted Derreenacrinnig West Windfarm. The proposed development involves the following works: (a) removal of approximately 9.5 km of 20 kV overhead line (OHL) along the route, the OHL to be removed consists of 138 wood poles (ranging from 9m to 12.5m above ground), supporting electrical conductor lines and ancillary structures and equipment (b) following removal of the OHL, it is proposed to construct approximately 10.8 km of 20 kV overhead line (OHL) along the route, the OHL to be constructed consists of c. 157 wood poles (ranging from 9m to 12.5m above ground), supporting electrical conductor lines and ancillary structures and equipment. (c) installation of approximately 4 km of underground cable ducting and associated electrical cabling, and all other ancillary works including joint bays, culverts, marker posts and all associated developments. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning authority with the application. / 0.2 km away / 18 October 2022Granted
- 19/10The installation of approximately 3.2km of underground cable ducting and associated electrical cabling, approximately 1.2km of overhead line supported on wood polesets, and all other ancillary works including joint bays, culverts, marker posts and all associated developments. The works, which will take place at six separate locations along the 14km grid connection route, are required to complete the grid connection from Derreenacrinnig West Windfarm to the ESB Ballylickey substation. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the authority with the application. Advisory Note: The full extent of the grid connection is approximately 14km the remaining 9.6km has already been installed and is the submect of an application for leave to apply for substitute consent to An Bord Pleanála Reference 302837-18 / 0.2 km away / 30 September 2019Granted
- 01/6121Dwellinghouse / 0.3 km away / 04 January 2002Granted
- 00/1002Dwellinghouse / 0.3 km away / 31 July 2000Granted
- 05/4324Dwellinghouse / 0.3 km away / 15 August 2005Granted
- 01/5332Retention of dwelling, retention & completion of domestic garage & revised site boundaries / 0.3 km away / 22 November 2001Granted
- 00/5630Dwelling / 0.3 km away / 16 November 2000Granted