Townlands of Coomatallin, Kippagh and The Pike, Drinagh, Co. Cork
Planning application 12/436
DecisionConditional grant
Decided22 August 2012
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Townlands of Coomatallin, Kippagh and The Pike, Drinagh, Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 06/960Windfarm consisting of 7no. wind turbines, meteorological mast (50m high), electrical sub-station, control building, upgrading entrance and ancillary works / 0.2 km away / 19 July 2006Granted
- 00/6380Windfarm consisting of 7 no. wind turbines,meteorological mast(50m high),electrical sub- station,control building,up- grading entrance & anc. works / 0.2 km away / 29 May 2001Granted
- 00/6382Construction of a 50m high monitoring mast for wind measurement purposes / 0.3 km away / 23 February 2001Granted
- 25/6057The development will consist of: The extension of the operational duration of the existing Coomatallin Wind Farm and associated infrastructure (as permitted pursuant to Cork County Council Planning Register Reference 00/6380) for a further period of 20 years from the date of the expiry of its current operational duration. No changes are proposed to the number or dimensions of the existing permitted wind turbines. The existing wind farm comprises: (i) 4 no. wind turbines; (ii) associated turbine foundations and crane hardstandings; (iii) 2 no. site entrances, from the L8586 and L8299 public roads respectively; (iv) approximately 2.4 kilometres (km) of on-site access tracks; (v) a 20 kilovolt (kV) electrical substation and control building with a gross floor area of 74 square metres and associated electrical apparatus; (vi) underground electrical and communications cabling; and (vii) a meteorological mast with a total height of 60 metres (m). The development provides for the installation of an aviation warning light on turbine T4. This planning application is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement which includes an assessment of the likely significant effects of the development; both individually and in combination with the relevant off-site or secondary developments which will occur as a direct result of the development, including the development' s existing grid connection infrastructure which comprises approximately 160m of 20kV underground electricity line and approximately 8km of 20kV overhead electricity line located within the townlands of Kippagh, Coomatallin, The Pike, Drinagh East, Lisbealad East, Lisbealad West, Kilronane West, Kilronane East, Milleenanannig, Nedinagh West and Ballyhalwick, County Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning And Development Regulations 2001 to 2025 shall apply. The planning application, Environmental Impact Assessment Report and Natura Impact Statement may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of - (a) 5 weeks or (b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission. / 0.3 km away / 21 November 2025Granted
- 16/134Change of use of part of an existing farm-holding from agricultural use to religious community use, the completion of the demolition of an existing agricultural outbuilding, the erection of a chapel building encompassing the footprint of said agricultural building, the installation of a wastewater treatment system and car parking facilities and the carrying out all associated works / 0.7 km away / 25 April 2016Granted
- 15/675A single electricity generating wind turbine with a hub height of up to 65m and a rotor diameter of up to 55m, giving an overall tip height not exceeding 92.5m, with associated hardstand area, control building, access track and associated site works at Kippagh, Drinagh, Co. Cork. The planning application is accompanied by an Environmental Report (ER). / 0.7 km away / 29 January 2016Granted
- 02/3062Dwelling / 0.8 km away / 29 November 2002Granted
- 00/4810Dwellinghouse / 0.8 km away / 21 September 2000Granted