Gneeves Near Millstreet
Planning application 13/4566
DecisionUnconditional grant
Decided24 May 2013
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Gneeves Near Millstreet?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 08/5636Completion of wind farm (13 no. turbines) granted under pl. reg. no. 99/0616 and modified under pl. reg. no. 03/6585 / 0.0 km away / 01 July 2008Granted
- 04/188Extension to windfarm permitted under reg. no. N/99/0616 to consist of 4 no. wind turbines (hub height 65m, blade tip 91m), construction of and extension of internal site tracks and associated works / 0.0 km away / 09 July 2004Granted
- 24/6475A fifteen (15) year planning permission for continuation of the operational life of the existing Gneeves wind farm from the date of expiration (November 2025) of the current planning permission (N/99/616, 03/6585, 04/188). The site measures 10.101 hectares. The existing wind farm consists of the following; 11 no. existing, operational Vestas V52 wind turbines, 8 no. turbines have a tip height of 91 m and a hub height of 65m, the remaining 3 no. turbines have a tip height of 76.1m and a hub height of 49m. All 11turbines have a rotor diameter of 52m. 1 no. existing operational onsite substation compound, the compound comprises: 38kV electrical substation, a control building, associated electrical plant and equipment, security fencing, associated underground cabling, existing site access tracks and 11 no. turbine hardstandings, existing operational site drainage infrastructure and associated works, including maintenance and improvement works. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) have been prepared in relation to the project and accompany this planning application. / 0.1 km away / 21 January 2026Granted
- 13/5717Ten year planning permission for an extension to existing Gneeves Wind Farm (Planning Refs. 99/0616, 03/6585, 04/1355, 04/0188, 08/5636, 13/4566). The proposed extension will comprise of 3no. turbines (each with a maximum tip height of 91m), a borrow pit, new internal access roads, upgrading of existing internal access roads, underground cables, an extension to the existing substation building with a wastewater holding tank and ancillary works / 0.1 km away / 29 July 2014Granted
- 03/6585Modifications to windfarm permitted under Reg. No. N/99/0616 to include increase of the turbine height from 44m to 65m / 0.2 km away / 20 February 2004Granted
- 07/41773 no. borrow pits for the provision of stone for site road construction within the adjoining wind farm / 0.8 km away / 09 March 2007Granted
- 07/10105Windfarm development comprising of 8 no. wind turbines, sub station, meteorological mast, associated access roads, borrow pit and associated works / 0.8 km away / 21 July 2008Granted
- 07/10106Erection of 80m temporary meteorological mast for wind measurement / 1.0 km away / 27 September 2007Granted