Ballytigeen Whitegate Co.Cork
Planning application 13/5464
DecisionConditional grant
Decided20 September 2013
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballytigeen Whitegate Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 23/6011Permission for construction of a machinery/straw storage shed and associated site works / 0.1 km away / 29 November 2023Granted
- 20/4268Construction of a machinery/straw storage shed and associated site works. / 0.1 km away / 25 March 2020Granted
- 03/4726Upgrade of electrical equipment in the existing 110kv compound,installation of 2no. replacement transformers & equipment in new compound / 0.3 km away / 04 November 2003Granted
- 03/5609Installation of a replacement flare tower of 51m in height / 0.4 km away / 17 February 2004Granted
- 24/5747Permission the importation of soil & stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a temporary haul road. An Environmental Impact Assessment Report (EIAR) has been prepared and is submitted with the application. A Natura Impact Statement (NIS) has been prepared and is submitted with the application / 0.5 km away / 06 October 2025Granted
- 17/4344Construction of a new steel distillation column T204N of height 38 metres above ground level and 1.2 metres in diameter, to improve Propane and Butane product quality. The column will be provided with steel access platforms and pipework connections to existing facilities. The column will be placed on a new concrete foundation at ground level, with surface water drainage routed to existing facilities. There will be no continuous emissions from the column. / 0.6 km away / 13 April 2017Granted
- 08/8727Construction of 1 no. stainless steel column T302N of which 51m will be above ground (including pipework), approx 1.4m diameter at upper part and 2.06m diameter at lower part / 0.6 km away / 28 October 2008Granted
- 03/2301See application for details / 0.6 km away / 07 August 2003Granted