Raheens/Barnahely/shanbally Ringaskiddy Co Cork
Planning application 13/5759
DecisionConditional grant
Decided21 October 2013
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Raheens/Barnahely/shanbally Ringaskiddy Co Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 18/6038Construction of a below ground foul pumping station incorporating a below ground emergency storage tank, a below ground storm water pumping station, a 3.1m high control building and ESB substation, a 2.65m high chemical dosing unit, provision of a 2.15m high standby generator with acoustic barrier, a 1.5m high air handling unit with acoustic barrier, a 4m high mobile lifting gantry and a 2.4m high security fence along with indigenous plant screening. Pipework associated with the development includes a foul rising main along the R613, local roads and green fields from the foul pumping station to the Shanbally WWTP (c. 3km) as well as 3 no. short sections of pipeline (c. 136.5m in total) associated with the storm water pumping station and foul pumping station. Installation of 2 no. new reinforced concrete manhole chambers on existing pipelines will also be required. The development will also consist of all associated site work and site excavation works both above and below ground for the pumping stations, pipelines. The works will include the demolition of a derelict bungalow at proposed pumping stations site. / 0.0 km away / 12 June 2019Granted
- 08/6844Construction of 84 no. space extension to existing car park, realignment of existing adjacent site road to accommodate car park extension, provision of associated drainage, lighting and landscaping / 0.1 km away / 01 July 2008Granted
- 07/8443Extension to existing NIPBI laboratory and 2 no. extensions to NIPBI offices, construction of internal rooftop storage area, external rooftop plant and all associated on-site infrastructure / 0.1 km away / 27 July 2007Granted
- 11/6053Construction of a single storey extension to the western side of the existing NIPBI laboratory building consisting of 8 no. laboratories with associted offices, stores and toilets at ground floor with a total gross floor area of 1,384 square metres, a partial first floor extension consisting of staff welfare facilities with a total gross floor area of 161 square metres, external roof top plant and all associated on-site infrastructure. It is proposed to construct the extension in 2 phases, phase 1 consisting of 4 ground floor laboratories, offices, stores and toilets and the first floor welfare rooms and external roof top plant to a height of 8.1 metres at its highest point. Phase 2 will consist of 4 laboratories, offices and stores at ground floor to a height of 5.45 square metres. The external architectural treatment of the new extension will match the existing NIPBI building. / 0.1 km away / 17 November 2011Granted
- 14/5395Planning permission is sought for construction of a new single storey equipment storage warehouse to the West of the existing project store with a floor area of 582.6sqm and 8m in height above ground, new two-storey training and development building to the Eastern side of the existing North South access corridor with a floor area of 836.6sqm and 11.6m in height above ground, a single storey cafeteria extension to the West of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a single storey office extension to the East of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 1 with a floor area of 385.9sqm and 9.64m in height above ground, a two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 2 with a floor area of 448.1sqm and 9.64m in height above ground, A two-storey extension to the south of the existing NIPBI office building. The extension to the NIPBI building is to be built in 2 phases. Phase 1 will consist of ground floor offices with a floor area of 387.7sqm and a first floor plant room with a floor area of 96.5sqm and a maximum 5.88m in height above ground. Phase 2 will consist of ground floor offices with a floor area of 150sqm and a ground floor cafeteria of 74.5sqm and a maximum of 3.15m in height above ground. An extension to the Southern end of the existing surface level car park for an additional 40no. cars is included in this application. The development will include all associated on-site infrastructure. / 0.2 km away / 18 March 2015Granted
- 05/4464Bulk solvent storage and drum filling facility inside an existing disused water storage tank / 0.2 km away / 18 August 2005Granted
- 22/5411The installation of a solar photovoltaic (PV) Array (Proposed Area = 1132m2) on the roof of an existing single storey warehouse building with new external vertical access ladder to south elevation at the existing facility and associated site works on an Integrated Pollution Control (IPC Reg. No. P0476) licensed site for Recordati Ireland Ltd. / 0.3 km away / 11 August 2022Granted
- 13/5727Construction of a three-storey extension to the existing small scale facility building (561) and a two-storey extension to the existing QA/QC Laboratory Building (441). The proposed 561 Building extension is 1457sqm in area and 23m in height and includes intermediate mezzanine floors above ground floor and first floor and an open plant area at roof level. The proposed 441 building extension is 1211sqm in area and 17m in height and includes an open plant area at roof level. The development will include all associated on-site infrastructure. / 0.3 km away / 15 October 2013Granted