Carrignafoy Cobh Co.Cork
Planning application 13/6104
DecisionConditional grant
Decided19 December 2013
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Carrignafoy Cobh Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 03/3169Bungalow and waste water treatment system / 0.2 km away / 26 January 2004Granted
- 06/5993Attic conversion and alterations to elevations of dwelling / 0.3 km away / 25 May 2006Granted
- 17/6548Single storey side extension, modifications to the size and number of windows to the rear elevation and addition of stone slips to the front elevation and side elevations of the front porch of bungalow. / 0.3 km away / 21 November 2017Granted
- 06/6985Extension to dwelling / 0.3 km away / 03 July 2006Granted
- 25/5474Construction of 98 no. residential units (comprising a mix of 32 no. 2, 3, & 4 bed detached, semi-detached and terraced houses and 66 no. 1, 2 and 3 bed duplexes/apartments. 10 no. houses will have the option of a ground floor annex to the rear of the proposed dwellings) and all associated ancillary development works including the undergrounding of existing 38kV ESB line traversing the site, access, footpaths, parking, drainage, landscaping and amenity areas. Vehicular and pedestrian access to the proposed development is via the Orchard/College Manor with pedestrian/cycle access via College Lawn and the Crescent. The proposed development comprises phase 2 of a two-phase residential development at this location. / 0.3 km away / 09 February 2026Granted
- 16/5867The development consists of: A 65sq.m extension to the rear of the existing filling station shop building to accommodate back of house facilities (storage, toilets). Reconfiguration of the existing internal shop layout to provide for a retail area (63sq.m net floor area); 1 no. food offer (26sq.m) and seating area (20sq.m). Reduction in size of existing canopy over the fuel pumps (rear portion). Removal of faux slate cladding on the canopy and over the shop, along with new branding to 4 sides of canopy. Changes to the front elevation including new window openings, new door, increased size of existing window and new signage. Replacement of main ID sign at front of the site (6.5m high). All associated site works including new brush wash, lined car parking, and new proprietary treatment foul treatment system with raised bed percolation area. / 0.4 km away / 13 December 2016Granted
- 13/50101) Partial demolition works to the existing service station building and ancillary site features; 2) Extension (16.3sqm), change of use (88.5sqm) and alterations to the existing service station building to provide office space, sluice room, corridor, lobby, toilets, store rooms, retail floor (82sqm) with wine sales, and takeaway facility complete with drive-thru. 3) Construction of ancillary site features such as signage, boundary treatments, landscaping and car parking and all associated site works / 0.4 km away / 23 September 2013Granted
- 24/4072Permission for the construction of 98 no. residential units (comprising a mix of 94 no. 2, 3, & 4 bed detached, semi-detached and terraced houses and 4 no. 1 bed apartments. 45 no. units will have the option of a ground floor annex to the rear of the proposed dwellings) and all associated ancillary development works including the undergrounding of existing 38kV ESB line traversing the site, access, footpaths, parking, drainage, landscaping and amenity areas. Vehicular and pedestrian access to the proposed development is via the Orchard/College Manor with pedestrian/cycle access via College Lawn and the Crescent also. The proposed development comprises phase 1 of a two-phase residential development at this location. / 0.4 km away / 30 October 2024Granted