Barry's Hall Timoleague Bandon Co. Cork
Planning application 13/83
DecisionConditional permission
Decided29 July 2013
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Barry's Hall Timoleague Bandon Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 13/90The proposed development consists of 21,080m2 of Glasshouse, education facility, parking area, dispatch area, cold store, irrigation room, plant room, 2 no. 250,000 litre water buffer tanks, office/staff building, waste water treatment system, fuel storage, access roads, entrance and associated site works including a rainwater reservoir / 0.1 km away / 04 June 2013Granted
- 18/4Construct a Biogas Plant consisting of 2 no. digester tanks, 2 no. validation tanks, 1 no. homogenising tank, 3 no. geo-membrane lined manure storage tanks, 1 no. fibre store, 1 no. feed tank, reception building, plant building, pasteurisation tanks, weighbridge and associated site works including an integrated constructed wetlands to produce renewable energy and fertilizer / 0.2 km away / 26 February 2018Granted
- 11/366Single storey office/amenity block extension / 0.4 km away / 06 September 2011Granted
- 10/772Cover part of existing yard to extend their storage and processing facilities. The application relates to a development which comprises or is for the purpose of an activity requiring an Integrated Pollution Prevention and Control Licence / 0.4 km away / 17 February 2011Granted
- 06/1267Extend existing meat processing factory, car park and new site entrance / 0.4 km away / 15 November 2006Granted
- 22/5849A) construction of an acoustic wall and associated canopy, B) all associated site works. This application relates to an establishment which has an Industrial Emissions License and an Integrated Pollution Control License (P0947-01). / 0.4 km away / 21 February 2023Granted
- 20/5127Extension to the western elevation of the existing pig processing facility consisting of: a) new box storage & packaging store b) the relocation of an existing packing store, curing room, blast chill & freezers to allow for an increase in dispatch area within the existing building c) all associated site works. This application relates to an establishment which has an Industrial Emissions License and an Integrated Pollution Control License (P0947-01). / 0.4 km away / 22 February 2021Granted
- 14/82Permission for (a) extension of the existing lairage and process areas, (b) relocate lorry wash, (c) new bored well, (d) modify the entrance, all on the existing site, and (e) to construct a new car park with new entrance on their adjacent site / 0.4 km away / 28 May 2014Granted