Lysaghtstown Carrigtwohill Co.Cork
Planning application 14/4670
DecisionConditional grant
Decided18 August 2014
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Lysaghtstown Carrigtwohill Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 20/6891A 10 year planning permission for a solar farm consisting of circa 14,600 m2 of solar panels on ground mounted frames, 2 no. single storey electrical inverter/transformer stations, battery storage container, battery control unit, security fencing, satellite pole, CCTV, access tracks, upgrade to existing agricultural field entrance, temporary construction compound, landscaping and all associated ancillary development works. The proposed development is a change of plan to part of the solar farm previously permitted under Cork County Council planning reference 18/6769 and will provide for the omission of the previously permitted 38kV substation and a net decrease in overall panel area of circa 10,800 m2 from that permitted under 18/6769. Construction and operational access will be via the L-7634. The operational lifespan of the solar farm will be 35 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 0.2 km away / 19 February 2021Granted
- 16/4135To extend single storey dwellinghouse, modify the windows and doors on the existing structure, construct a new vehicular entrance from the public roadway, install an on-site sewage treatment system, together with all associated site development works / 0.2 km away / 18 March 2016Granted
- 21/5089A 10 year planning permission for 2 no.33kv underground electricity interconnector cables of c.2.59 km in length to be provided predominantly in excavated trenches and include associated underground ducting, joint bays, communication chambers and all associated site development and reinstatement works. The proposed development provides for a change of plan to part of the solar farm previously permitted under Cork County Council planning reference 18/6769 (as amended by 20/6891), 19/5729 and 19/6882 and will provide for the laying of underground interconnector cabling between inverters permitted under these applications. The works will be carried out within the solar farm boundary, on private lands and within the public road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 0.3 km away / 20 October 2021Granted
- 18/6769Permission for a solar farm consisting of circa 235,500 m2 of solar panels on ground mounted frames, 1 no. single storey 38 kV substation and associated electrical compound, 15 no. single storey electrical inverter/transformer stations, battery storage module and associated equipment container, security fencing, satellite pole, CCTV, landscaping and all associated ancillary development works. Construction and operational access will be via existing field entrances from the L-7634. The operational lifespan of the solar farm will be 35 years. / 0.3 km away / 13 December 2018Granted
- 07/11800Two storey extension to cottage, construction of garage and installation of septic tank / 0.3 km away / 12 December 2007Granted
- 17/7440Construction of a single storey extension to the front of the existing dwellinghouse, alterations to existing elevations and all associated site works. / 0.4 km away / 26 February 2018Granted
- 08/7965Alterations, ground floor and first floor extension with solar panels to existing single storey dwellinghouse, detached garage and associated site works / 0.4 km away / 05 September 2008Granted
- 06/5054Dwellinghouse and construction of entrance to serve existing dwelling / 0.4 km away / 13 June 2006Granted