Ballynona North Dungourney Co.Cork
Planning application 14/5024
DecisionConditional grant
Decided30 January 2015
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballynona North Dungourney Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 23/6000Retention for the construction of a single storey forklift charging building and all ancillary site development works. The proposed development is for modifications to an establishment to which the Major Accident Directive applies. / 0.1 km away / 27 November 2023Granted
- 19/4641The expansion of the existing maturation warehouse facility and all ancillary site development works. The proposed development includes 60 no. maturation warehouses, which will be constructed in 30 no. blocks of 2 warehouses and 3 no. ESB substations. Ancillary site development works include landscaping, tree felling, berming, fencing, settlement basin and a surface water attenuation pond. Access to the expanded maturation facility will be via the existing entrance and access road from the L3800. Emergency access will be provided via the existing gated entrance from the L7693. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application. The proposed development is for modifications to an establishment to which the Major Accident Directive applies. / 0.1 km away / 17 July 2019Granted
- 10/8418Construction of 40 no. maturation warehouses and all ancillary site development works and buildings. The proposed development also includes permission for the realignment and upgrade of the junction of the L3800 and R627 with ancillary landscaping and traffic calming measures at Dungourney. The proposed maturation warehouses will be constructed in 20 no. blocks of 2 warehouses. The ancillary buildings and structures will include staff facility building, sprinkler pump-house, fork lift shed, ESB substation and 2 no. water sprinler tanks. Associated landscaping and site development works are proposed, including a package sewage treatment plant and associated percolation area, sprinkler water retention pond, a surface water attenuation pond, tree felling, berming and perimeter fencing. Access to the site will be via an upgraded entrance including security barrier from the L3800 and will include a new bridge crossing of the Dungourney River / 0.4 km away / 25 March 2011Granted
- 05/8796Slurry storage tank and ancillary concrete works / 0.8 km away / 02 March 2006Granted
- 12/4455Construction of a garage and associated works / 0.9 km away / 30 April 2012Granted
- 14/4896Extension to existing dwellinghouse and associated site works / 1.0 km away / 25 June 2014Granted
- 07/8467Dwelling and garage / 1.1 km away / 01 August 2007Granted
- 03/3342Dormer bungalow / 1.2 km away / 01 September 2003Granted