Carhoon East Bandon Co.Cork
Planning application 14/5850
DecisionConditional grant
Decided27 November 2014
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Carhoon East Bandon Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 03/3061Dwellinghouse / 0.1 km away / 21 October 2003Granted
- 06/4357Dwellinghouse and garage / 0.2 km away / 30 May 2006Granted
- 09/6114Demolition of front porch, two storey extension to rear and single storey outbuilding at side and construction of front porch, single storey extension to rear and one and half storey extension to side and elevational alterations to existing two storey dwelling / 0.4 km away / 20 August 2009Granted
- 06/9755Change of use of existing silage pit to cubicle house, construction of overground slurry tank, underground slurry tank and silage slab / 0.5 km away / 09 October 2006Granted
- 04/871Dwellinghouse (change of plan) / 0.5 km away / 21 June 2004Granted
- 20/6103Retention of (i) front entrance porch (ii) side sun-room extension (iii) side bedroom with en-suite & walk-in extension and (iv)rear store & toilet extension, all to the existing dwelling. / 0.5 km away / 25 January 2021Granted
- 14/5282Modification of existing front boundary detailing, namely; the removal of existing row of leylandii trees, construction of a 1.80m high natural stone wall, and the cladding of the existing front boundary walls and piers in natural stone / 0.6 km away / 08 September 2014Granted
- 05/6245Alterations and extension to dwelling / 0.6 km away / 21 November 2005Granted