Knocknagarrane Old Chapel Bandon, Co Cork
Planning application 15/5081
DecisionUnconditional grant
Decided14 July 2015
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Knocknagarrane Old Chapel Bandon, Co Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 10/4194Residential development 4no.two-storey dwellings with individual bio-cycle treatment units & all associated site works / 0.0 km away / 05 July 2010Granted
- 25/6346Permission for phase 2 of a proposed new residential development at site at lands at Knocknagarrane, Old Chapel, Bandon, Co. Cork. The proposed residential development comprises phase 2 of the scheme, with Phase 1 previously granted under Plg/ reg. No. 23/6403 (consisting of permitted 16 no. dwelling houses and associated site works). Phase 2 of the proposed residential development will consist of the construction of 11 no. new dwelling houses (comprising a mix of 1 no. 4 bedroom 2-storey detached dwelling house, 2 no. 2 bedroom 2 storey semi-detached dwelling houses, 4 no. 3 bedroom 2-storey semi-detached dwelling houses, 4 no. 4 bedroom 2-storey semi-detached dwelling houses) and all associated ancillary site development works including the removal of an existing gated site agricultural entrance and associated piers, located along south boundary. Vehicular and pedestrian access to the proposed development will be provided via the estate entrance, as permitted under 23/6403, from Old Clonakilty Road (L2063), to the south of the proposed site. The internal access road and footpath, as permitted under Plg.Reg.No. 23/6403, will be extended to the west, to serve the proposed Phase 2 residential development. / 0.1 km away / 23 December 2025Granted
- 10/5070Vehicular entrance for agricultural purposes & associated site works / 0.1 km away / 23 June 2010Granted
- 23/6403Permission for phase 1 of a proposed new residential development at the site at lands Knocknagarrane, Old Chapel, Bandon, Co.Cork. Phase 1 of the proposed residential development will consist of the construction of 16 no. new dwelling houses (8 no. 3 bedroom 2-storey semi-detached dwelling houses, 8 no. 4 bedroom 2 storey semi-detached dwelling houses) and all associated ancillary site development works including the removal of an existing agricultural site entrance and the provision of new vehicular and pedestrian access to the proposed development via new estate entrance from old Clonakilty road (L2063), to south of the proposed site. / 0.1 km away / 29 November 2024Granted
- 24/4165Permission for the construction of a residential development of 19 no. dwelling houses and all ancillary site development works. The proposed development comprises 4 no. 4 bedroom detached/semi-detached dwelling houses, 13 no. 3 bedroom detached/semi-detached/townhouse dwellings and2 no. bedroom semi-detached dwellings. Vehicular and pedestrian access to the proposed development will be provided from the L2063 to the north of the site with pedestrian access also provided from Crossmahon Road to the south. The proposed development also includes public realm improvements comprising new footpath infrastructure, provision of a pedestrian crossing on the L2063 and the upgrade of the junction of the L2063, Crossmahon Road and Woodfield and all other ancillary site development works. / 0.1 km away / 16 August 2024Granted
- 10/6246Construction of first floor extension to side of dwelling / 0.2 km away / 21 October 2010Granted
- 22/5962Alterations to dwelling including (a) retention of change of use from garage to living area and (b) construction of first floor extension to side of dwelling house / 0.2 km away / 17 October 2022Granted
- 18/4747The Development will consist of 1)The Proposed demolition of the existing 32.10 sq. m / 345.52 sq. ft. single-storey storage building; 2)The proposed modification of the existing 419.23 sq. m / 4512.55 sq. ft. single-storey commercial building, namely: A) change of use from commercial use as a tile showroom to commercial use as a vehicle showroom, B) Removal of an existing rooflight, C) Construction of a 32.28 sq. m. / 347.46 sq. ft. single-storey extension to front (north-facing) elevation & side (west-facing) elevation, D) Alteration of elevational arrangements including installation of additional glazing and doors, application of render to external walls, and replacement of roof cladding with parapet walling, and E) the erection of illuminated building signage; 3) The proposed construction of an additional vehicular entrance; 4) The proposed construction of 0.60 m. high natural stone boundary walling with 0.60 m. high wrought iron railing; 5) The proposed installation of site lighting; 6) All ancillary works. / 0.2 km away / 29 November 2018Granted