PepsiCo Worldwide Flavours Plant Kilnagleary Industrial Estate, Kilnagleary Carrigaline Co. Cork
Planning application 15/5305
DecisionConditional grant
Decided11 August 2015
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near PepsiCo Worldwide Flavours Plant Kilnagleary Industrial Estate, Kilnagleary Carrigaline Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 16/6079The construction of: an extension to an existing factory building to house an extended locker room and toilet facilities and associated site works. / 0.0 km away / 10 October 2016Granted
- 16/4476Construction of: (1) a 180sq.m extension to the East including a storage area at ground floor with an electrical switch room at first floor, (2) a 40sq.m extension to the West of the existing Process Building, (3) a new loading dock and roller shutter door to the East, (4) a new roller shutter door to the South of the plant, (5) a new hardstanding area, and (6) all associated site works / 0.0 km away / 25 April 2016Granted
- 15/4834Construction of extension to process building and all associated site works / 0.0 km away / 16 July 2015Granted
- 18/4709To construct a truck unloading and cold room extension, two bunded storage tanks and an extension to the car-park at the North side of the existing main process building and all associated site works at their existing plant. / 0.0 km away / 14 May 2018Granted
- 24/5750Permission for the construction of a new entrance lobby to the front of the existing main entrance, new signage, modifications to existing signage and all associated site works. The proposed development is on a site in which the Chemicals Act (Control of Major Accidents Hazards involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies. / 0.0 km away / 11 November 2024Granted
- 06/13625Extension to Process building and ancillary works / 0.0 km away / 23 April 2007Granted
- 13/5657New external walkway adjoining the north side of the existing plant / 0.0 km away / 03 October 2013Granted
- 19/6026Construction of a granny flat to side of existing dwelling and carry out all associated site works. / 0.2 km away / 03 December 2019Granted