Midleton 110 kV Carrigogna Midleton Co. Cork
Planning application 15/5441
DecisionConditional grant
Decided17 August 2015
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Midleton 110 kV Carrigogna Midleton Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 22/5789Alterations to the existing Midleton 110kV station to include a single storey extension on the northern side of the existing control building and the extension of the existing compound palisade fence to the north of the site. / 0.0 km away / 21 September 2022Granted
- 06/12675Two storey extension to dwellinghouse and replacement of windows / 0.1 km away / 26 January 2007Granted
- 18/4550Development of grid system services facility within a total site area of up to 0.76 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switcher gear, electrical inverter/transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and new site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, animal fencing, earth bund and landscaping works and all associated ancillary infrastructure on land. / 0.1 km away / 26 April 2018Granted
- 23/524610 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Midleton 110kV Electricity Substation. The proposed development will have a projected life span of 30 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.0.83 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 13 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure. / 0.1 km away / 12 September 2023Granted
- 07/9533Construction of sunroom extension to dwelling / 0.1 km away / 04 September 2007Granted
- 22/6054Construct a two-storey dwelling house, domestic garage, new vehicular entrance, wastewater treatment system and percolation area and all associated site works / 0.1 km away / 08 May 2023Granted
- 08/6739Relocation of existing vehicular entrance to serve existing warehouse/light industrial units / 0.2 km away / 06 August 2008Granted
- 07/13412Retention of 1 no. building comprising of 5 no. warehouse/light industrial units with first floor mezzanine to 3 no. units and provision of car park/hardstanding area / 0.2 km away / 06 August 2008Granted