Mallow General Hospital Kilknockan Mallow Co. Cork
Planning application 15/5814
DecisionUnconditional grant
Decided18 September 2015
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Mallow General Hospital Kilknockan Mallow Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 10/5319Demolition of existing derelict prefab and replacement with new prefab medical records building to rear of OPD dept. / 0.0 km away / 21 July 2010Granted
- 11/6316Construction of a two storey (over basement) extension to provide accommodation for a new Medical Assessment Unit and a new Endoscopy Unit with associated plant located at basement level, a new separate stair and lift block connected to the existing main hospital building, a new 32 space car park and local access road, a new fire water storage tank and associated site works / 0.1 km away / 09 February 2012Granted
- 05/6319Demolition of office and construction of single storey CT (Computed Tomography) scan extension with canopy extension to hospital and associated works / 0.1 km away / 26 October 2005Granted
- 25/4942Permission for a) the construction of an extension to the existing visitors carpark at the west side of the campus, to provide new 76 spaces, associated site works including new access road and retaining structures, site lighting, and landscaping works, and b) the provision of 4 new accessible parking spaces, relocated bus/taxi setdown area to the south of the existing hospital entrance. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 0.1 km away / 10 February 2026Granted
- 06/12155Construction of stepped and ramped access to restored entrance to first floor of former nurses residence and retention of compressor and manifold house, oxygen compound and plant room / 0.1 km away / 11 January 2007Granted
- 24/5690Permission for retention of the construction of a four storey (over basement) ward block (7,040 sqm total) located on the west side of the campus at Mallow General Hospital, to provide new inpatient accommodation over four floors, plant rooms, 3 no. stair and lift blocks (two with lifts), enclosed link to the existing main hospital building on two levels, a new medium voltage switchroom (24sqm) on the east side of the campus, alterations to the existing main hospital to accommodate access to the new link, associated site works including external plant areas, new access roads and retaining structures, site lighting, ambulance setdown area, and landscaping works / 0.2 km away / 18 April 2025Granted
- 10/6014Two-storey dwelling house, garage, entrance, septic tank & polishing filter, and associated site works / 0.2 km away / 05 October 2010Granted
- 06/10708Demolition of existing treatment plant and construction of waste water treatment plant and control building and access road to serve hospital / 0.2 km away / 13 November 2006Granted