Tullyland Bandon Co. Cork
Planning application 16/4736
DecisionConditional grant
Decided24 June 2016
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Tullyland Bandon Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 08/6740Dwellinghouse, garage and installation of septic tank / 0.2 km away / 01 July 2008Granted
- 03/2226Construction of slatted house / 0.3 km away / 25 August 2003Granted
- 19/6330Construct a cattle house with slatted slurry tank and carry out associated site works / 0.3 km away / 08 November 2019Granted
- 07/11224Raising levels and infill of land with soil and stone and mixed construction and demolition waste for the purposes of agriculture / 0.4 km away / 03 June 2008Granted
- 09/4711Retention of dwelling (change of house type from that permitted under Pl. Reg. No. S/02/1541) & retention of revised site boundaries / 0.4 km away / 05 May 2009Granted
- 15/6499Construction of a detached two storey dormer dwelling, alterations to the extent and location of the existing site entrance, a new driveway, the installation of a wastewater treatment system and all associated site works / 0.5 km away / 03 March 2016Granted
- 08/8424Construction of vehicular entrance to serve existing dwelling / 0.6 km away / 09 October 2008Granted
- 05/2335Dwellinghouse and garage / 0.6 km away / 12 December 2005Granted