Greenfield Ballincollig Co. Cork
Planning application 16/4918
DecisionConditional grant
Decided11 August 2016
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Greenfield Ballincollig Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 18/4904Construction of a new single and two storey dwellinghouse, new vehicular entrance, septic tank and percolation area, new agricultural entrance, and all associated site works / 0.1 km away / 12 September 2018Granted
- 24/6305Permission to erect a longhouse modular building for use as a home office, comprising two rooms and toilet, plus ancillary site works. / 0.1 km away / 04 February 2025Granted
- 05/3724Erection of 25 m. high, free standing monopole communications structure, carrying antennae and communication dishes with associated ground mounted equipment cabins to share with other licensed operators within a 2.4 m. high palisade compound at ESB Ballincollig 38kV substation / 0.2 km away / 25 July 2005Granted
- 15/4301Permission for the continued use of an existing 25 metre high free standing monopole communications structure carrying antennae and communication dishes to share with other licensed operators within an existing 2.4m high palisade compound / 0.2 km away / 08 April 2015Granted
- 10/4928Extension to dwelling & re-roofing of the existing dwelling / 0.3 km away / 10 June 2010Granted
- 22/5656Intend to apply for 10 year planning permission. Underground electricity grid connection cabling, substation and ancillary site works. The development will comprise (1) a grid connection consisting of medium voltage cables and ducting in a excavated trench with a total length of c.1194 meters which will be installed on private land and public roads (L-2216 & L-22161); (2) control/switching substation consisting of either (i) single storey block building or (ii) 2 no. modular units; (3) cable beam over grange hill stream; (4) provision of ring main unit (RMU); (5) and all associated site development and reinstatement works. The proposed development includes minor revisions to the approved layout of the solar farm previously permitted under Cork County Council planning reference 18/5760 comprising omission of substation and satellite mast, and provision of the above referenced RMU, and the addition of a cable beam and underground cabling. The purpose of the proposed development is to connect the permitted solar farm under reference 18/5760 to the national grid at the existing Ballincollig 38Kv substation. / 0.3 km away / 10 November 2022Granted
- 18/5964The construction of extension to dwelling and associated site works. / 0.4 km away / 05 December 2018Granted
- 18/5760A solar farm consisting of circa 75,000 m2 of solar panels on ground mounted frames, 1 no. single storey substation, 6 no. single storey electrical inverter/transformer stations, battery storage module and associated equipment container, security fencing, satellite pole, CCTV, and all associated ancillary development works. Construction access will be via the existing entrance from the L-2216 to the north with operational access from the local country road to the east. / 0.7 km away / 12 March 2019Granted