Beach Road DRI Beach Road Maulbaun Passage West
Planning application 16/5841
DecisionConditional grant
Decided12 September 2016
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Beach Road DRI Beach Road Maulbaun Passage West?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 03/140Dwellinghouse (change of layout) / 0.1 km away / 03 March 2003Granted
- 03/2924Extension to dwellinghouse / 0.1 km away / 07 August 2003Granted
- 19/6827To construct new dormer style dwelling and all associated site works. / 0.1 km away / 06 July 2020Granted
- 15/4375Dwelling house and associated site infrastructure / 0.1 km away / 28 April 2015Granted
- 11/6573Construction of a new pitched roof and gable wall to replace a flat roof to part of their dwelling house / 0.1 km away / 31 January 2012Granted
- 10/5501Construction of a rock-filled woven mesh gabion retaining wall, associated earthworks and landscaping / 0.1 km away / 16 November 2010Granted
- 08/4086Demolition of dwellinghouse and rear extensions of 4 no. dwellinghouses, reclamation of foreshore and construction of mixed use and residential development comprising of 349 no. residential units, construction of anchor convenience store, 19 no. retail units including change of use of No.5, Dock Terrace to retail space, construction of leisure centre, office space, 100 no. bed hotel, bar and restaurant with external eating area with canopies, creche facility, civic/community use, switch buildings, basement lifts and ESB substations, open space, provision of basement car parking, landscaping with water feature, boardwalk and amenity areas, vehicular and pedestrian accesses, temporary sewage treatment unit and construction of marina to include marina building with office, reception and kiosk and all associated site works and services / 0.2 km away / 15 October 2008Granted
- 15/5502Retention of bay window to master bedroom, roof-lights to sunroom, window to kitchen on southern elevation and extension to front porch / 0.2 km away / 27 August 2015Granted