Ballynoran Ballyhea Co.Cork
Planning application 17/4460
DecisionConditional grant
Decided21 July 2017
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballynoran Ballyhea Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 03/2546Bungalow / 0.3 km away / 18 July 2003Granted
- 23/6099The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application. / 0.3 km away / 01 July 2024Granted
- 05/471Garage / 0.3 km away / 29 March 2005Granted
- 14/4817Construction of dwellinghouse, alterations to existing entrance of adjoining to form double entrance, waste water treatment system and all associated site works / 0.5 km away / 09 June 2014Granted
- 12/6385Dormer type dwelling and installation of bio waste water treatment system - Extension of duration of permission granted under Planning Reg. No. 07/11538 / 0.7 km away / 07 January 2013Granted
- 07/11538Dormer type dwelling and installation of bio waste water treatment system / 0.7 km away / 18 January 2008Granted
- 04/7707Extensions to dwelling / 0.9 km away / 26 November 2004Granted
- 10/61572MW wind turbine with maximum tower height of 85 metres and a maximum rotor diameter of 82 metres together with associated underground cabling works / 0.9 km away / 26 April 2011Granted