Ballyellis Mallow Co.Cork
Planning application 17/4621
DecisionConditional grant
Decided23 November 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyellis Mallow Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 04/5975Retention of dwellinghouse with garage, entrance, septic tank and percolation area / 0.0 km away / 28 September 2004Granted
- 09/5777Retention & completion of domestic garage to side of dwelling / 0.1 km away / 24 August 2009Granted
- 18/4276Retention of existing dwelling, garage (domestic use) and entrance as constructed under Planning Reg. No. 416/73 / 0.1 km away / 29 March 2018Granted
- 19/6936Permission for retention of lorry depot and vehicular parking, permission for retention for change of use from agricultural shed to workshop and vehicle store, permission for retention of extension to rear incorporating workshop and vehicle store and storage of agricultural machinery, permission for retention for change of use from sow house to power washer store and permission for retention for change of use from milking parlour to store and for permission for new parking area at the rear of site for vehicular parking and lorry depot and permission for alterations of entrance to site, all with associated site works. / 0.1 km away / 26 August 2020Granted
- 19/5746To construct a dwelling house to include a granny flat & for construction of a detached domestic garage with related site works. / 0.2 km away / 28 August 2020Granted
- 20/6524The construction of a new treated water storage tank comprising 1 no. 33.9m diameter single-celled precast underground concrete tank; ancillary structures comprising of 1 no. underground concrete scour chamber, 1 no. de-chlorination system and associated above-ground kiosk, and 1 no. above ground telemetry kiosk; and other ancillary development including associated underground pipework and cabling, extension to existing hard-surfaced internal circulation area, landscaping and all associated site development works. / 0.2 km away / 03 June 2021Granted
- 25/6943The proposed development includes for the upgrade of the existing Mallow WTP to bring it into compliance with Uisce Éireann technical guidance documents with regards the coagulation, flocculation & clarification (CFC), filtration, chemical storage & dosing and residuals treatment processes. In addition, as part of the upgrade works it is proposed to increase the capacity of the WTP from 4,754m3/day to 5,042m3/ 22 hours. The development will consist/consists of the following: • Upgrade of the existing CFC process, including for the following: o Construction of a new flash mixing chamber with vertical turbine paddle; o Construction of a 3 no. cell flocculation stage and mixing process (Note: The provision of the new flash mixing and flocculation tank will require the relocation of existing outdoor chemical bulk storage tanks, the demolition of an existing storage building adjacent the main WTP building and the relocation of existing overhead lines.) • Pipework modifications to the existing rapid gravity filters. • Upgrade of the existing washwater residuals and sludge handling processes to ensure adequate treatment of residuals prior to river discharge and adequate storage for sludge on site, including: o 1no. new below ground equalization tank o 1no. new above ground settlement tank to be installed. o Re-purpose the existing sludge holding tank as a sludge balance tank. o 1no. picket fence thickener. o 1no. new sludge holding tank. o 2 no. pumping station kiosks, including: -sludge pumping station -sludge holding tank feed pumping station • Upgrade of the existing chemical storage arrangements including: o Installation of 1 no. outdoor Fluoride Bulk storage tank with integrated weather shrouded bund o Installation of 2 no. outdoor Poly Aluminium Chloride bulk storage tanks with integrated weather shrouded bunds o Installation of 2 no. outdoor Sodium Hydroxide bulk storage tanks with integrated weather shrouded bunds o Installation of 1no. outdoor Sodium Hypochlorite bulk storage tank. o Installation of 2 no. dedicated chemical delivery apron upon which chemical delivery vehicles shall park while unloading chemicals to the bulk storage tanks. The surface water network for the chemical delivery apron shall be able to be isolated during chemical deliveries and redirected towards a dedicated underground containment tank to capture any chemical spills. o Installation of 1no. indoor Orthophosphate bulk storage tank and bund. (Note, the existing chemical building to be modified including for replacement of 2 no. windows with a single and double door respectively). • Upgrade of the road layout to facilitate the proposed infrastructure upgrade for delivery of chemicals and sludge removal off-site. • Upgrade the surface water management for the proposed works, ensuring that the design complies with the requirements for sustainable drainage system (SuDS). • All ancillary site works including upgrade of the existing electrical, instrumentation, control & automation of the plant, diversion of existing overhead power lines and tree and hedgerow removal. / 0.2 km away / 24 February 2026Granted
- 03/496Extension to dwelling and detached domestic garage / 0.2 km away / 04 April 2003Granted