Adjacent to Unit 9 Sitecast Industrial Estate Ballytrasna, Little Island Co. Cork
Planning application 18/4568
DecisionConditional grant
Decided25 April 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Adjacent to Unit 9 Sitecast Industrial Estate Ballytrasna, Little Island Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 16/4085The demolition of an existing warehouse building and construction of a new building for expansion of their R&D Facility and car parking area, construction of a new substation, boiler house, covered bin store, MCC room, external air handling unit and all associated site works / 0.1 km away / 14 March 2016Granted
- 21/4392Construct extensions to the front and rear of existing commercial premises and Permission for Retention of first floor mezzanine area. / 0.1 km away / 12 July 2021Granted
- 04/5261Construction of light industrial unit, new entrance to existing light industrial unit, additional car park, new storm water connection to existing storm water sewer / 0.1 km away / 02 September 2004Granted
- 10/8424Extension to the existing Aislinn unit at the North of thier site at Little Island Business Park, to accommodate a new Laboratory at ground floor and associated offices at first floor along with all associated site works / 0.1 km away / 13 January 2011Granted
- 20/6971The construction of a new two storey filling hall extension and all associated site works at the plant. / 0.1 km away / 24 June 2021Granted
- 18/7411The construction of extensions to the R&D Facilities including a two story office and circulation space with entrance canopy extension to the front (South) of the building, a new entrance, stairwell and meeting room at the East side of the building, new first floor toilets and a new utility building to the North side of the building, a new stairwell to the West of the building, new palisade fencing along South and East of the site and all associated site works at the plant. / 0.1 km away / 25 February 2019Granted
- 21/4120(1) the demolition of the existing Emerald and Inis Buildings and canopy walkway to the rear O’Neill’s Building (2) the construction of a two storey Research & Development Facility that includes laboratories, offices, training/meeting rooms, kitchen, canteen area, WCs, open courtyard, open plant area to the rear at first floor level, storage areas, link at ground and first floor level to the existing Research & Development Facility. (3) The construction of a new 2.5m wide footpath and cedar clad boundary fence to the south and east of the building to match exiting with sliding gates & pedestrian/turnstiles and the replacement of the existing chain link fence with new chain link fence to the northern boundary. (4) The construction of a new service yard & associated vehicular entrance to the east of the building, waste compound & gas botte storage area (5) The installation of roof top mounted plant, flues and 60m2 of photovoltaic solar panels (6) The installation of a bicycle stand, two new road-crossings and a revised parking layout to the east of O’Neill Building and all associated site works. (7) and are also applying for permission for retention of existing roadside lay-by. All at their plant at Little Island Business Park. / 0.1 km away / 24 June 2021Granted
- 14/4030Alterations to the front elevation of the Aislinn Building to match adjacent R & D Building / 0.1 km away / 27 February 2014Granted