GrantedDecided 04 December 2019Cork County Council

Mallow WWTP, Mallow Bridge Pump Station,Mallow Ballyellis,Bearforest Lwr,Ballydahin.Spa Glen Carhookeal,Quartertown Lower,Castlelands,Annabella Lackanalooha,Kilknockan

Planning application 19/5078
DecisionConditional grant
Decided04 December 2019
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Cork County Council.
The alteration of Mallow Sewerage Scheme to remove combined sewer overflows from the network. The proposed scheme will include: 1. The alteration of Mallow Wastewater Treatment Plant to provide for wastewater treatment capacity for 22,000pe (increased from 18,000pe) at Ballyellis, Mallow. The WWTP upgrade will comprise construction of new local pumping station, refurbishment/replacement of inlet works, distribution chambers, alteration of existing tanks, construction of plinths and kiosks, sludge import acceptance unit, sludge tanks, chemical storage tanks, associated pumps, replacement of sludge presses in existing sludge building with centrifuges, all with associated odour control facilities, electrical control panels and kiosks, standby power generation equipment and diesel tank, extensions to existing access roads and all associated site development and site excavation works above and below ground. 2. Construction of a new pump station at Bearforest Lower, Mallow, to transfer flows from the network to the WWTP at Ballyellis. The development will contain a foul sump, storm sump, valve chamber, lifting gantries, access stairs, control house with MV Substation, storm tank, interconnecting pipework and chambers, overflow pipework and chambers from storm tank to river Blackwater, twin rising mains to WWTP at Ballyellis, flow meter chambers, odour control equipment, 2.4m high boundary fence, access gate, access roads, hardstanding areas, landscaping and all associated site development and site excavation works above and below ground. Existing pump station to be decommissioned and above ground structure demolished on completion. 3. Upgrade of sections of the sewer network in Mallow comprising construction of pipelines and chambers in fields, public open spaces, roads and footpaths in the townlands of Ballyellis, Bearforest Lower, Ballydahin, Carhookeal, Quartertown Lower, Castlelands, Mallow, Annabella, Lackanalooha, Kilknockan and Spa Glen. Pipelines will include a crossing of the river Blackwater between Castlelands and Bearforest Lower east of Mallow Bridge. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Cork has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Mallow WWTP, Mallow Bridge Pump Station,Mallow Ballyellis,Bearforest Lwr,Ballydahin.Spa Glen Carhookeal,Quartertown Lower,Castlelands,Annabella Lackanalooha,Kilknockan?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →