Curraglass Kealkill Co. Cork
Planning application 19/519
DecisionRefused
Decided27 November 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Curraglass Kealkill Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 20/350A ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning) and will consist of the following i. Up to 7 no. wind turbines with an overall blade tip height of up to 178.5 metres and all associated foundations and hard-standing areas; ii 2 no. borrow pits; iii 1 No. permanent meteorological mast with a maximum height of up to 112 metres; iv. Upgrade of existing and provision of new site access roads; v. Upgrade to existing access junction; vi. A 38kV electricity substation, including 4 no. battery storage containers, 1 no. control building with welfare facilities, associated electrical plant and equipment, security fencing, and waste water holding tank; vii. Forestry Felling; viii. A temporary construction compound; ix. Site Drainage; x. All associated internal underground cabling, including underground grid connection cabling to the existing overhead line; and xi. All associated site development and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement have been prepared in relation to the proposed development and accompanies this planning application / 0.8 km away / 26 August 2020Refused
- 08/1227Dwellinghouse, detached domestic garage and all associated site works / 1.5 km away / 22 August 2008Refused
- 23/668Construction of dwelling house and all associated site works / 1.7 km away / 25 January 2024Refused
- 08/566Dwellinghouse and domestic garage / 3.3 km away / 22 May 2008Refused
- 08/565Dwellinghouse and garage / 3.4 km away / 22 May 2008Refused
- 03/3879Dwellinghouse / 3.6 km away / 24 September 2003Refused
- 03/3883Dwellinghouse / 3.6 km away / 24 September 2003Refused
- 03/3884One and a half storey dwellinghouse / 3.6 km away / 24 September 2003Refused