Coolvallanane Beg Kinsale Co. Cork
Planning application 19/6324
DecisionConditional grant
Decided16 April 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Coolvallanane Beg Kinsale Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 16/5519Retention of conversion of first floor of dwellinghouse from storage to living accommodation and retention of alterations to elevations of dwellinghouse including 4 velux windows and 1 window to side elevation of dwellinghouse / 0.2 km away / 03 October 2016Granted
- 09/5079Construction of domestic garage and associated site works / 0.2 km away / 24 July 2009Granted
- 03/5266Dwelling & treatment unit / 0.2 km away / 02 February 2004Granted
- 25/416710 Year Planning permission for a solar farm with a total area of circa 9 hectares. The solar farm will consist of solar panels on ground mounted frames, 2 no. single storey electrical inverter/transformer stations, 2 no. containerised energy storage modules, 1 no. single storey spare parts container, 1 no. medium voltage control/switching substation (comprising either single-storey building or 2 no. modular units), 1 no. weather station, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 1 no. existing entrance from the L7247. The operational lifespan of the solar farm will be 40 years and planning permission is requested for the duration. / 0.2 km away / 15 September 2025Granted
- 23/6137Permission to construct a single storey dwelling house, vehicular entrance, treatment plant and soil polishing filter and all associated site works / 0.3 km away / 24 June 2024Granted
- 21/4555A two storey, two bedroom dwelling with a new entrance and installation of a septic tank and percolation area with site works. / 0.3 km away / 25 June 2021Granted
- 23/4820The construction of a two-storey dwelling with a new entrance and installation of a septic tank and percolation area with ancillary site works / 0.3 km away / 03 August 2023Granted
- 14/5793Alterations to existing 38 kV station consisting of new 38 kV line bay and associated site works / 0.4 km away / 01 October 2014Granted