Townlands of Ballyroe, Dromin, Ballynadrideen Ardnageehy, Rathnacally and Clashganniv in Ballyhea Charleville, Co. Cork
Planning application 20/4041
DecisionConditional permission
Decided16 February 2021
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Townlands of Ballyroe, Dromin, Ballynadrideen Ardnageehy, Rathnacally and Clashganniv in Ballyhea Charleville, Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 15/4659Sand and gravel quarry with an extraction area of approximately 1.7ha and all associated ancillary development works / 0.0 km away / 29 January 2018Granted
- 05/2386Construction of portal frame building consisting of offices, steel fabrication workshop and electropolishing plant / 0.7 km away / 16 September 2005Granted
- 12/5271Retention of extensions to existing light industrial engineering workshop: (1) extension housing gantry crane, (2) single storey extension to rear (west), (3) single storey storage tanks extension area to side (south), (4) new location of septic tank and percolation area, and (5) elevation changes and associated site works / 0.7 km away / 25 October 2012Granted
- 04/148Dwellinghouse / 0.8 km away / 10 March 2004Granted
- 07/6511Construction of slatted tank and extension to existing milking parlour / 0.9 km away / 21 May 2007Granted
- 05/5479Dwellinghouse and garage / 0.9 km away / 22 September 2005Granted
- 22/5681A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclosures, a temporary construction compound, use of existing farm access tracks, existing site entrance, underground cabling, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the Planning Authority with this application. / 1.0 km away / 19 June 2023Granted
- 08/8679Relocation of site entrance to existing dwellinghouse / 1.1 km away / 16 October 2008Granted