Killetra Park Road Mallow Co. Cork
Planning application 20/7001
DecisionConditional grant
Decided08 April 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Killetra Park Road Mallow Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 13/55015Permission for placing a portable recyclables container beside the existing waste compactor / 0.2 km away / 22 July 2013Granted
- 24/5483Permission for the construction of a single storey retail warehouse (unit 3) to the immediate east of retail unit 2 permitted under application reference 20/4925; roller shutter door to the rear elevation; signage; rooftop plant; extension to the delivery yard area permitted under application register reference 20/4925; and all associated site development and drainage works on a site that forms part of the Mallow South Town Centre Development (under construction). The proposed development will modify condition no. 2, which omitted the proposed retail units 3 and 4, attached to application reference 20/4925. The proposed modified condition no. 2, will exclude the omission of retail unit no. 3. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application. / 0.2 km away / 04 July 2025Granted
- 25/5629Permission for the construction of an ancillary bulk storage building and all associated site development works (change of elevational treatment of the southern and western elevations of the ancillary bulk storage building previously permitted under application register reference 20/4925) on a site to the south of, and attached to, the Co-Op store at West End and Park Road, Annabella, Mallow, Co. Cork. / 0.2 km away / 06 October 2025Granted
- 06/55094Construct a fully serviced dwelling / 0.3 km away / 20 February 2007Granted
- 05/55048Mixed use retail/commercial/leisure/residential town centre development incorporating 24,224m retail, 4,130m office, 1,180m leisure, 2,290m restaurant/pub and 2,941m residential with 1,036 no. car parking spaces, of which 20 are disabled parking spaces, and of which 450 car parking spaces at basement level, access/transfer lobby and travelator from surface level to basement level, signage, site development works, and landscaping works; three public squares, demolition works, a new southern access route linking the N20 to Park Road, a new road linking the proposed development to West End, a new bus drop-off/pick-up stop on Park Road, service yards, refuse stores/areas, all on lands of 6.19 hectares (15.32 acres) / 0.3 km away / 10 May 2006Granted
- 20/5697Permission for retention of detached domestic shed as constructed for use as domestic store and utility room and retention of shed as constructed for use as garden utensil store. / 0.3 km away / 05 October 2020Granted
- 16/5560Construction of new vehicular entrance and all associated site works / 0.3 km away / 27 October 2016Granted
- 23/5077Alterations to Co-op store and café permitted, not yet constructed, under application register reference 20/4925, which will comprise: 1) the construction of a first floor internal mezzanine to the Co-op store to accommodate a staff area (offices, staff canteen and welfare facilities); 2) the construction of a first floor bulk store mezzanine to accommodate an additional bulk storage area; 3) all ancillary works including internal stairs and a lift; and 4) the construction of a ground floor extension to the café and associated extended external canopy / 0.3 km away / 31 August 2023Granted