GrantedDecided 24 June 2021Cork County Council

Kerrygold Park Mitchelstown Co. Cork

Planning application 21/4516
DecisionConditional grant
Decided24 June 2021
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Cork County Council.
An extension (4364m2) to the existing Butter Processing Facility (6146m2) for the manufacture, packaging and distribution of Butter products permitted by Cork County Council planning application references 145908 & 196855. The proposal will comprise: extensions adjoining the main building ranging from c.9.35m to 18.85m in height consisting of; c.330m2 of office/ancillary accommodation arranged over two storeys, c.1,219m2 of ground floor production space, with c. 331m2 of first floor / mezzanine production space, c.1,987m2 of single storey storage/distribution space, enclosed plant space c.118m2 with open plant area above of c. 7m in height and a single storey liquid ingredients intake building extension c.68m2 with open plant area above of c. 9.5m in height. 7 no. new liquid storage silos of c.15 m in height with associated access platforms. A new single storey maintenance store c. 103m2 of c.5.5m in height. A new enclosure for existing wastewater pre-treatment equipment c.112m2 of c. 4.0m in height. A new enclosure to the existing process water storage tank of c.96m2 of c. 5.5m in height. Relocation of existing liquid storage unit. Existing external signage relocated on western elevation. 36 no. new car parking spaces in a new parking area containing 72 space of which 36 are displaced by the proposed extension, 17 no. new bicycle parking spaces, 4 no. new motorcycle parking spaces. Landscaping, hardstandings, underground services and ancillary works. All on site area of 2.62 Ha. All access to and from the site will remain by way of the existing access road to Castlefarm from the N73 (Kildorrery) roundabout. The application relates to a development which is located on a site which operates under Industrial Emissions License P0404-02. The environmental Impact Assessment Report and Natura Impact Statement will be submitted to the Planning Authority with the application.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Cork has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Kerrygold Park Mitchelstown Co. Cork?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →