Units 1, 2 4 and 5 Blackwater House Mallow Business Park Gooldshill Mallow, Co. Cork
Planning application 21/4835
DecisionConditional grant
Decided25 May 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Units 1, 2 4 and 5 Blackwater House Mallow Business Park Gooldshill Mallow, Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 07/12611Sub-division of four storey office building under construction (planning reference 06/4500) permitted for single occupancy is now to consist of 12 no. separate individual offices, alterations to site boundaries, revised car parking layout, additional entrance, ancillary site works and permission for retention of elevational alterations to permitted building / 0.0 km away / 25 January 2008Granted
- 19/5657The change of use of Unit 3 from office use, to allow for both medical research/services use (Class 8) and office/administrative use (Class 3) and all associated ancillary development / 0.0 km away / 16 August 2019Granted
- 06/4500Construction of four storey office building and associated works / 0.0 km away / 28 March 2006Granted
- 08/6182A) Construction of 3-storey office building comprising of 11 no. offices and ancillary accommodation, bin store, electrical/mechanical/comms building, additional surface water attenuation tank and on site retaining walls B)Revisions to foul and surface water drainage layouts including the relocation of a surface water attenuation tank and revisions to car parking layout previously permitted under Pl. Reg. No. 06/4500 and C) All ancillary site services / 0.1 km away / 01 December 2008Granted
- 08/8299Construction of ESB substation / 0.1 km away / 01 October 2008Granted
- 07/11985Construction of 3 no. office buildings comprising of 1 no. three storey building with roof top plant and subdivided into 5 no. units for separate usage (Building No. 1), 1 no. three storey building with roof top plant and subdivided into 6 no. units for separate usage (Building No. 2) and 1 no. two storey building with roof top plant for one usage (Building No. 3), construction of double height car park and all ancillary site works / 0.1 km away / 28 May 2008Granted
- 12/6134To erect a free standing totem sign at the vehicular entrance to Mallow Business Park / 0.1 km away / 03 December 2012Granted
- 15/6066Construction of detached garage, extension of existing dwelling and material alterations to elevations of existing dwelling / 0.1 km away / 06 November 2015Granted