Wallingstown Little Island Co. Cork
Planning application 21/5225
DecisionUnconditional grant
Decided29 June 2021
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Wallingstown Little Island Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 16/5606The development of an 110kV substation at the former Mitsui Denman site. The proposed substation will comprise of: a two-storey Gas Insulated Switcher (GIS) 110/20kV substation building, an associated single storey Gas Insulated Switchgear (GIS) 20kV substation building, associated outdoor electrical equipment, including filter banks, transformers, cable sealing ends and surge arresters, two number lightning protection masts (12.5 metres in height), associated internal access road, boundary treatment including substation perimeter fencing and all ancillary site development works. Construction of two number 110kV underground cable ducts between the proposed substation and the existing Eirgrid 110kV substation to the North in Wallingstown. The site area of the proposed substation is approximately 0.60ha. The proposed substation is to support development in the Wallingstown area in Little Island / 0.0 km away / 22 August 2016Granted
- 22/5746Development at the site of the permitted, not yet constructed, 110kV substation on the former Mitsui Denman site consisting of modifications to the 110kV substation permitted by Cork County Council under Pl.Reg.No. 16/5606, as extended under Pl.Reg.No. 21/5225. The proposed modifications will consist of: (1) an increase in the floor area of the permitted two-storey Gas Insulated Switchgear (GIS) 110/20kV substation building (Building A) from c.236.34m2 to c.1,291m2, as well as an increase in height from c.10.4m to c.15m; (b) 1 no. additional single-storey 20 kV switch room and protection building (Building C) (c.151m2); (c) an increase in site area from c.06ha to 0.9249ha: (d) all associated site works including 1 no. additional lighting rod (c.12.5m in height), revisions to 2.4m high palisade security fencing, a new sliding gate, a kiosk on a concrete plinth, and the realignment of the 2 no. 110kV underground cable ducts between the proposed substation and the existing EirGrid 110kV substation to the north. / 0.0 km away / 19 September 2022Granted
- 23/51311 no. data centre building with ancillary offices, car parking, waste compound, generators, landscaping, lighting, provision of an access off the R623, the provision of back-up accesses connecting the proposal to the data centre development permitted under 17/5895 and associated boundary alterations and all ancillary site works. The proposal will modify part of an existing consent, 16/5011 for data centre development, modifying that part and also superseding an existing consent for office development under 07/12475. Extension of Duration to Permission granted under Planning Ref. No. 17/6980. / 0.0 km away / 28 October 2023Granted
- 17/6980The proposed development includes 1 no. data centre building with ancillary offices, car parking, waste compound, generators, landscaping, lighting, provision of an access off the R623, the provision of back-up accesses connecting the proposal to the data centre development permitted under 17/5895 and associated boundary alterations and all ancillary site works. The proposal will modify part of an existing consent, 16/5011 for data centre development, modifying that part and also superseding an existing consent for office development under 07/12475. / 0.0 km away / 19 January 2018Granted
- 23/4506The construction of a single-storey 10/20kV ESB substation and all associated site development works. / 0.1 km away / 11 May 2023Granted
- 15/5450Demolition of existing structures on site and construction of Phase 1 of a Business Park development to include 4 no. office based industry/enterprise buildings of 2 to 3 storey's with associated roads and access infrastructure, car parking, landscaping, site level changes, services and ancillary works, construction of 2 no. roundabouts at access points off the R623 and construction of 4 no. electricity substations - Extention of duration of permission granted under planning ref: 07/12475 / 0.1 km away / 24 August 2015Granted
- 07/12475Demolition of existing structures on site and construction of Phase 1 of a Business Park development to include 4 no. office based industry/enterprise buildings of 2 to 3 storey's with associated roads and access infrastructure, car parking, landscaping, site level changes, services and ancillary works, construction of 2 no. roundabouts at access points off the R623 and construction of 4 no. electricity substations / 0.1 km away / 11 December 2008Granted
- 05/7800Redevelopment of industrial lands for enterprise use to include site development works including construction of 2 no. entrances, 1 no. security building, ESB substation, internal access roads and hardstanding, car parking, surface water sewer, foul sewer, watermain, fencing, site leveling, lighting, landscaping, entrance water feature, totem pole and signage and construction of 4 no. two storey enterprise units / 0.1 km away / 19 December 2005Granted