Inchera AGI Wallingston Industrial Estate Little Island Co. Cork
Planning application 21/5498
DecisionConditional grant
Decided21 July 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Inchera AGI Wallingston Industrial Estate Little Island Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 21/5574Proposed change of use/alterations of an existing pharmaceutical facility building to a data centre including ground and first floor extension to the existing building. The proposed development will include demolition of an existing storage shed, connection to existing mains services and provision of ancillary plant/services including 3 no. chillers, 1 no. fuel storage tank, 3 no. generators, 1 no. medium voltage electrical substation, and 3 no. switch rooms, together with all associated site works. / 0.0 km away / 03 June 2022Granted
- 12/6090Demolition of redundant industrial buildings, structures, plant and equipment, including a purified water building, production buildings, milling and drying buildings, operational facilities buildings, technical services offices, synthesis plant, stores, workshops, utilities building, substation and ancillary pipe racks, plant and equipment / 0.1 km away / 27 February 2013Granted
- 03/1187See application for details / 0.1 km away / 12 May 2003Granted
- 19/5676Change of use and internal alteration of an existing administration / office building to a laboratory with ancillary office space. The proposed development will include for refurbishment and renewal works to the existing roof of the building, elevational changes including new entrance doors and new mechanical extract flues, totem signage, bin and gas tank enclosures. Access to the site will be from the existing entrance to the R623. / 0.1 km away / 23 September 2019Granted
- 24/4238The removal of an existing steel frame and the construction of an unmanned fuel service station solely for the use of trucks consisting of 1) 1 no. diesel island dispensing diesel on each side; 2) the re-use of 2 no. existing above ground tanks for diesel storage; and 3) all associated ancillary development works including vehicular access, landscaping, drainage, plant and services area. Extension of Duration to Permission granted under Planning Ref. No. 18/6138 / 0.1 km away / 22 May 2024Granted
- 18/6183The removal of an existing steel frame and the construction of an unmanned fuel service station solely for the use of trucks consisting of 1) 1 no. diesel island dispensing diesel on each side; 2) the re-use of 2 no. existing above ground tanks for diesel storage; and 3) all associated ancillary development works including vehicular access, landscaping, drainage, plant and services area. / 0.1 km away / 09 October 2018Granted
- 20/6428A proposed saltbarn. The application will involve the construction of a 3-bay 1,223sqm salt barn and machinery store and all associated works. A Natura Impact statement has been submitted with the planning application. / 0.2 km away / 06 April 2021Granted
- 25/6096The development will consist of permission to amend Condition No. 23 of Cork County Council Planning Register No. 25/05034 to allow construction to extend by one additional hour in the evenings, Monday to Friday, and by one additional hour in both the morning and afternoon on Saturdays. Site development and building works shall only be carried out between the hours of 08:00 to 19:00 Mondays to Fridays inclusive, between 08:00 to 14:00 on Saturdays and not at all on Sundays and Public Holidays. Deviation from these times shall only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. Reason: In order to safeguard the amenities of adjoining landuses. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, Reg. No. P1018-01. / 0.2 km away / 25 November 2025Granted