Harbour Point Business Park Courtstown Little Island Co. Cork
Planning application 22/4008
DecisionConditional grant
Decided22 December 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Harbour Point Business Park Courtstown Little Island Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 10/5923Warehouse/light industrial unit totalling 5553sqm, car parking & yard, surface water sewer, foul sewer, watermain, site levelling, lighting & landscaping on a site of 2.06 hectares / 0.0 km away / 26 October 2010Granted
- 07/7927Construction of ESB substation and switchroom to serve 9 no. existing light industrial units / 0.1 km away / 28 June 2007Granted
- 07/4334Upgrading and extension to existing access road to include provision of entrance gates, surface water sewer, foul sewer, watermain, site levelling, lighting and fencing / 0.1 km away / 02 May 2007Granted
- 22/5482Erection of signage on existing enterprise unit / 0.1 km away / 11 August 2022Granted
- 06/4984Construction of 3 no. enterprise unit blocks, each consisting of 8 no. units and construction of 2 no. ESB substations and switchrooms, access roads, hardstanding, car parking, 2 no. entrances, signage and all associated site works / 0.1 km away / 13 July 2006Granted
- 12/5221Construction of waste transfer and recycling station, office, truck garage,ESB sub station, buried diesel storage tank and associated site works including wheel wash and weighbridge, extension of duration to permission granted under planning reg 0710229 / 0.1 km away / 04 September 2012Granted
- 07/10229Construction of waste transfer and recycling station, office, truck garage,ESB sub station, buried diesel storage tank and associated site works including wheel wash and weighbridge / 0.1 km away / 03 December 2007Granted
- 18/7200Construct a building (6625 sq.m) containing a waste transfer and recycling facility. The proposed development also includes the construction of a separate two storey Administration Block (178sq.m), ESB Sub-Station (36 sq.m), 3 no. weighbridges, 2 no. access ramps, new exist gate and signage to eastern site boundary, new boundary treatments, supplementary planting inside western site boundary, underground firewater containment tank, underground diesel storage tank, service yard, 23 no. car parking spaces, new drainage works including 3 no. oil interceptors and 4 no. silt traps along with all associated site works all on a site measuring 1.49ha. The proposed development will require a Waste Licence and an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application. / 0.1 km away / 13 February 2020Granted