GrantedDecided 30 March 2023Cork County Council

Wastewater Treatment Plant (WwTP) Macroom Sleveen East Co. Cork

Planning application 22/4630
DecisionConditional grant
Decided30 March 2023
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Cork County Council.
Upgrade works at the wastewater treatment plant which will consist of 1. Construction of a new storm overflow and flow splitting chamber, inlet works including grit removal system and full flow to treatment pumping station, 2 no. new integrated fixed-film activated sludge reactor tanks (Aeration Tanks), 2 no. final settlement tanks, final water sampling manhole while retaining the existing outfall to the River Sullane, return and waste activated sludge pumping stations, chemical building including lime and ferric sulphate dosing systems with bunded chemical storage tanks, 1no. storm water storage tank equipped with storm water pumps, 1 no. sludge picket fence thickener, odour control system, a sheet pile flood protection wall within the site boundary, boundary treatments include a weld mesh security fence, new internal access road and public lighting. 2. Construction of a new control and administration building. 3.Decommissioning of the existing wastewater treatment plant, equipment and associated structures as part of the upgrade works. 4. Construction of a 42 kWp photovoltaic (PV) solar panels on ground mounted frames on the north western area of the site. The PV panel shall be used to supplement the energy demands of the proposed WwTP and will be arranged with a panel area of 185sqm approximately. 5. Establishment of a designated area to be utilized by Cork County Council Roads Department and construction of a new entrance point. 6. All associated site development works above and below ground. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Cork has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Wastewater Treatment Plant (WwTP) Macroom Sleveen East Co. Cork?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →