Fiddane Ballyhea Charleville Co.Cork
Planning application 22/6536
DecisionConditional grant
Decided15 June 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Fiddane Ballyhea Charleville Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 17/5799Development of a 67.8 hectare Solar PV Farm. The proposed solar farm will consist of the installation of a 30 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures 2.1m in height, together with 1 single storey ESB control room, 14 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing, site entrance, hardstanding area, landscaping along part of the northern site boundary and other associated development works, for the purpose of generating renewable energy electricity. / 0.0 km away / 26 January 2018Granted
- 20/5460Retention and completion of an extension to gable end of existing dwelling and permission for construction of a new vehicular entrance / 0.4 km away / 08 January 2021Granted
- 04/4320Dwellinghouse / 0.6 km away / 14 September 2004Granted
- 05/5834Dwelling / 0.6 km away / 05 December 2005Granted
- 06/12606Demolition of part of stable and part of dwellinghouse (original cottage) and construction of detached boiler house, installation of bay window to dwellinghouse and retention of sunroom, 2 no. bay windows, rear hip roof to gable, use of utility roof as balcony and change of balcony railing to concrete balstrade / 0.6 km away / 25 January 2007Granted
- 11/4151Construction of garage to rear of dwelling and retention of raising level of roof and conversion of attic to living accommodation with 3 no. velux rooflights to rear and 2 no. dormer windows to front of dwelling and septic tank and percolation area to rear / 0.6 km away / 03 May 2011Granted
- 08/9872Extension to milking parlour and extension to slatted unit for use as collection yard / 0.8 km away / 16 March 2009Granted
- 07/8838Construction of overground steel slurry store, reception tank, extension to cubicle house and extension to silage base / 0.8 km away / 01 August 2007Granted