Unit 5 Anchor Business Park Courtstown Little Island Co Cork
Planning application 23/4651
DecisionConditional grant
Decided30 May 2023
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 5 Anchor Business Park Courtstown Little Island Co Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 17/6290Extension of the existing commercial park access road off the regional Courtstown Road. There will be approximately 680 linear metres of a single carriageway road including spur roads for access to six potential industrial sites with a footpath and grass verge on each side to provide access to surrounding lands. The proposed scheme will also include the construction of a mini roundabout, associated drainage works, services ducting, gas and water main installation, public lighting and all associated site works. (Planning Permission previously granted under Planning Reg. No. 07/7192). / 0.0 km away / 26 October 2017Granted
- 21/4093Construction of the following (1) Two no. light industrial / warehouse units (Unit No. 5 and Unit No.6) with ancillary office space (Unit No. 5 is suitable for sub-division into two no. units) (2) ESB sub-station building (3) minor alterations to the commercial park access road and associated spur roads for access to the individual sites to that which was granted under Planning Ref. No. 17/6290 (4) Signage, car parking, site lighting, storm water attenuation systems and roof top solar PV panels and (5) all associated site development and landscape works. / 0.1 km away / 01 July 2021Granted
- 12/5723Construction of approx 663 linear metres of a single carrigeway road including spur roads with a footpath and grass verge on each side to provide access to surrounding lands from a road granted planning permission under ref 05/8924, the regrading of approx 7561m2 of land including the removal of rock at the south end of the site from a local high point of 23.5m to a finished level of approx 15m OD(M), new stone entrance walls with illuminated signage on either side of the road granted under planning ref 05/8924 at the junction of this road and the Courtstown Road and all associated landscaping works, 1 no. security hut integrated into the new stone entrance wall on the east side of the road granted under planning ref 05/8924, alterations to previously approved planning permission ref 05/8924 to provide a lay by/car park for 1 no. car, 2 no. ESB substations and all associated site works - Extension of duration of permission granted under Planning Reg. No. 07/7192 / 0.1 km away / 17 October 2012Granted
- 22/4509Permission for retention of the constructed ESB sub-station in its current location in lieu of the location granted in Planning Register No. 17/4638. / 0.1 km away / 26 April 2022Granted
- 24/4687Permission for the construction of 1 light industrial unit with ancillary office space, car parking and all associated site development and landscaping works at Unit 6, Lower Courtstown, Little Island, Cork. / 0.1 km away / 17 June 2024Granted
- 13/5535A corporate headquarters and warehousing development consisting of a 3 storey office building, workshop building with maintenance canopy, ballast and basket storage area, truck wash and diesel filling area partly covered by a canopy, 12 no. light industrial warehouse units and an ESB substation. Access to the proposed development will be via an extension to the access road permitted by 07/5768, extension of duration of permission granted under Planning Reg. No. 07/12751 / 0.1 km away / 20 September 2013Granted
- 07/12751Corporate headquarters & warehousing development consisting of a three storey office building, workshop building with maintenance canopy, ballast and basket storage area, truck wash and diesel filling area partly covered by a canopy, 12 no. light industrial warehouse units and an ESB substation. Access to the proposed development will be via an extension to an access road permitted by 07/5768 / 0.1 km away / 31 July 2008Granted
- 24/5777Permission to construct an ESB substation building (21.8 sqm) and carry out all associated site works / 0.1 km away / 11 November 2024Granted