'Clamont' Laharan Carrignavar Co.Cork
Planning application 23/5098
DecisionConditional grant
Decided15 May 2024
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 'Clamont' Laharan Carrignavar Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 04/3649Extensions to dwellinghouse and to garage / 0.0 km away / 19 July 2004Granted
- 19/6826Alterations to the existing dwelling and to the existing site entrance and for all associated site works. The alterations include the demolition of an existing first floor extension to the rear of the dwelling and internal changes to the ground floor and the 1st floor layouts of the existing dwelling which will reflect in a change of design of the road side and of the rear elevations; the proposed alteration of the existing site entrance implies a new design of the site entrance and the treatment of the entrance sides in order to provide the required sight lines in both directions. / 0.0 km away / 29 January 2020Granted
- 04/6355Construction of dwellinghouse incorporating existing cottage into same and associated site works to include widening of entrance / 0.1 km away / 13 October 2004Granted
- 19/5826Construction of an agricultural entrance and the erection of steel entrance gates and all ancillary works / 0.2 km away / 12 September 2019Granted
- 13/6478Demolition of existing domestic garage and construction of one and a half storey extension to side and single storey extension to rear of existing bungalow / 0.2 km away / 19 May 2014Granted
- 08/5051Dwellinghouse, detached garage and installation of proprietary treatment system, revisions to existing laneway and construction of vehicular entrance to serve existing dwellinghouse / 0.3 km away / 26 May 2008Granted
- 19/5685Construction of a new 2 storey 14 classroom school building including office spaces, special education tuition rooms, library and resource rooms, general purpose and multi purpose spaces and ancillary accommodation and a 5 classroom ASD unit with associated withdrawal rooms, central activities space and ancillary accommodation, 104No. roof mounted photovoltaic panels (64No. on the south-eastern facade & 40 no on the south-western facade) proposed site works to include provision for 67 no. car parking spaces with access from an existing shared access road via a new vehicular entrance, pedestrian entrance, set down areas for cars and a bus set down area, bicycle shelter, 2 no. ballcourts, hard surface play spaces, ASD soft play area, sensory garden, gas tank enclosure, landscaping, signage, boundary treatments, rainwater harvesting tank, stormwater attenuation tank, static water storage tank for firefighting purposes and all other associated site development works including connection to the foul and surface water mains on the public roadway. / 0.4 km away / 18 November 2019Granted
- 22/6359Construct a dwelling house, new vehicular entrance, domestic garage, install a wastewater treatment system & percolation area and all associated site works / 0.4 km away / 01 February 2023Granted