Kilshinahan Timoleague Co Cork
Planning application 23/5320
DecisionConditional grant
Decided15 November 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Kilshinahan Timoleague Co Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 15/4800Permission to construct a single storey extension to western side of existing dwelling, conversion of existing attic into living space to include 4 no. rooflights to southern elevation, 1 no. rooflight to northern elevation and construction of first floor window to eastern elevation / 0.1 km away / 19 October 2015Granted
- 03/2929Dwelling and garage / 0.3 km away / 19 November 2003Granted
- 22/6452Modification to the solar farm permitted under planning reg no. 15/6968 and extended under 21/4496. The modifications consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with 1 smaller transformer station and 1 smaller storage unit, changes to the design of the delivery station, change to permitted fencing type and associated layout changes. All modifications within the boundary of the permitted development. / 0.3 km away / 20 December 2022Granted
- 25/6532A c.5MW solar farm comprising approximately 14,000 photovoltaic panels on ground mounted frames, 1 no. single storey transformer station (15sqm), 1 no. single storey delivery station (53sqm), 2 no. single storey spare parts storage containers (15sqm each), security fencing, CCTV, landscaping and all other ancillary development works. The solar panels will be arranged within a developable area of approximately 8.6 ha at Kilshinahan, Timoleague, Co. Cork. The proposed development will consist of the construction and completion of the solar farm as permitted by and commenced under Planning Permission Ref. 15/6968, extended by Ref. 21/4496 and modified by Ref. 22/6452, with proposed minor changes to that which was permitted to the site layout, as shown in the permitted site layout drawings (Drawing Ref. No.s 4332_2005_A, 4332_2006_A and 4332_2007_A), including array arrangement and internal track route, and minor changes to the fence alignment along the north west boundary; and the addition of a second single storey spare parts storage container (15sqm) (2 no. single storey spare parts storage containers in total). It is anticipated that works under the extant planning permissions will commence with the approved site clearance works, access roads and temporary internal tracks/roads, fencing and gates, and the proposed development will incorporate those works and such further construction and completion of the solar farm as modified by the proposed grant of planning permission the subject of this application. A 2-year permission is sought, with works expected to commence in Q1 2026 under the extant permissions and this permission is sought to secure the completion of the solar farm development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. / 0.3 km away / 19 February 2026Granted
- 21/4496A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 8.6 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV, and all associated ancillary development works. - Extension of duration of permission granted under planning reference: 15/6968 / 0.3 km away / 21 April 2021Granted
- 15/6968A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 8.6 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV, and all associated ancillary development works. / 0.3 km away / 03 May 2016Granted
- 25/4884Permission for the construction of an agricultural building for the housing of horses and associated site works / 0.4 km away / 20 October 2025Granted
- 07/5614Construction of roofed structure to house cattle to include slatted unit, effluent tank, extension to existing silage yard and associated site works / 0.5 km away / 24 April 2007Granted