IDA Business & Technology Park Tullagreen Terry's-Land & Anngrove (townlands) Carrigtwohill, Co. Cork
Planning application 23/5968
DecisionConditional grant
Decided23 January 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near IDA Business & Technology Park Tullagreen Terry's-Land & Anngrove (townlands) Carrigtwohill, Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 23/6412Permission for the extension and expansion of their existing facility and all ancillary site development works. The proposed development provides for the construction of a new extension to the existing GE Healthcare building (approximate maximum height of 27 metres) comprising a new filling line, solution preparation and utilities building. The proposed development also includes: i) The demolition of an existing single storey entrance security building, upgrade and reconfiguration of existing site entrance to the north, construction of a new relocated single storey entrance security building, ii) The demolition of existing waste bins structure, gas storage building, and an existing contractors compound, inclusive of workshop, prefabs and other ancillary structures, iii) The establishment of a utilities yard to include a pump house, chemical store, waste storage building, fuel tank, fire water retention tanks, gas storage, liquid nitrogen tank (LN2), mains water tank (MW Tank), rainwater harvesting treatment hut (RWH Tank) rainwater harvesting tank (RWH Tank), pipe racks to the proposed new filling line, solution preparation and utilities building and all ancillary plant and services infrastructure, iv) All other ancillary site development works which includes signage, tree removal and compensatory planting, bicycle shelter, provision of a new gated pedestrian/cycle entrance to the south onto Cork Road (L-3678) and rooftop PV solar panels, site drainage and landscaping works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. / 0.0 km away / 16 December 2024Granted
- 14/4186Construction of a covered recycling bin storage area / 0.1 km away / 21 March 2014Granted
- 06/8241Car parking area, re-alignment of site circulation road and associated site works / 0.1 km away / 15 August 2006Granted
- 19/6192(1) To relocate the existing single storey gas bottle store (2) To relocate the existing single storey waste compactor enclosure and (3) All associated site development works. / 0.1 km away / 23 October 2019Granted
- 19/6052(1) To construct a new single storey extension of total area 750sqm to the western side of the existing main building containing a new high-speed Filling Line to replace the existing filling line on the current site for final product filling, (2) modifications to existing car parking area to suit proposed extension. (3) all associated site development works. / 0.1 km away / 16 October 2019Granted
- 15/6486(1) Construction of a new innovation extension building on two floors of total area 1277 square metres to the eastern side of the existing main building, with a new link corridor to existing ground floor, and a new escape staircase. The new innovation centre shall also include a canteen/kitchen area, changing/locker rooms and conference room to ground floor, and an open plan office with cellular offices to first floor. The new building will also incorporate a roof top plant room of total area 53 square metres in addition to solar panels. (2) Demolition of the existing canteen and link corridor, portacabin and utilities store. (3) Modifications to existing access road to suit proposed extension. (4) All associated site development works / 0.1 km away / 07 January 2016Granted
- 07/10940Construction of chemical waste store / 0.1 km away / 06 November 2007Granted
- 25/4506Alterations to the extension and expansion of their existing facility permitted by Cork County Council planning references 23/5968 and 23/6412 and all ancillary site development works. The proposed development includes alterations to planning reference 23/5968 comprising the omission of a permitted detention basin and replacement with Stormcell attenuation system. The proposed development also includes alterations to planning reference 23/6412 comprising: (i) The construction of a revised extension to the existing GE Healthcare building comprising a filling line, solution preparation and utilities building with an approximate maximum height of 13 metres (reduction from approximate maximum height of 27 metres). (ii) The reduction in area and reconfiguration of the permitted utilities yard/contractors compound to include a utilities building, electrical building, pump house, waste compactor building, nitrogen tank, mains water tank, piperacks to the proposed new filling line and solution preparation building and all ancillary plant and service infrastructure. The works provide for the maintenance of the existing project cabin and workshop buildings on site, with partial demolition of the workshop building. (iii) The relocation west of the existing vehicular site entrance from the north and associated realignment of the internal service road within the site. (iv) All other ancillary site development and enabling works which include rooftop PV panels, signage, revised servicing and drainage proposals, landscaping works and establishment of a temporary construction compound (area to be reinstated post construction phase) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 0.1 km away / 21 July 2025Granted